My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-04-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025 Regular
>
Agenda Packet_2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 4:19:43 PM
Creation date
2/18/2026 4:14:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/1/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />January 2025 43 Environmental Analysis <br />located complies with the off-street parking and open space requirements of the SAMC. <br />Therefore, the existing less than significant population, housing and employment impacts would <br />not result in new or different impacts nor would it increase unplanned growth and does not <br />trigger new population and housing impacts requiring the preparation of a subsequent or <br />supplemental EIR. <br /> <br />5.10 PUBLIC SERVICES <br /> <br />This section analyzes the effects to public services and recreational and park facilities from <br />implementing the proposed zoning code regulations. <br /> <br />Would the project: <br /> <br />a. Result in substantial adverse physical impacts associated with the provision of new or <br />physically altered governmental facilities, or the need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response times or other <br />performance objectives for fire protection? <br />b. Result in substantial adverse physical impacts associated with the provision of new or <br />physically altered governmental facilities, or the need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response times or other <br />performance objectives for police protection? <br />c. Result in substantial adverse physical impacts associated with the provision of new or <br />physically altered governmental facilities, or the need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response times or other <br />performance objectives for schools? <br />d. Result in substantial adverse physical impacts associated with the provision of new or <br />physically altered governmental facilities, or the need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response times or other <br />performance objectives for library services? <br />e. Result in substantial adverse physical impacts associated with the provision of new or <br />physically altered governmental facilities, or the need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response times or other <br />performance objectives for park services? <br /> <br />TZC EIR Conclusions <br /> <br />• Construction of new projects pursuant to the Transit Zoning Code (SD 84A and SD 84B) <br />would increase the demand for fire protection services, but it would not require the <br />construction of new or physically altered facilities to accommodate the increased <br />demand or maintain acceptable response times. (Impact 4.10-1: Less Than Significant <br />with mitigation) <br />• Operation of the proposed project would increase the demand for police services, <br />thereby requiring additional staffing, although it would not require the construction of <br />new or physically altered facilities or personnel to accommodate the increased demand. <br />(Impact 4.10-2: Less Than Significant with mitigation) <br />• Construction of new residential units within the project area would generate new <br />students that could require the addition of new classroom facilities, thereby requiring <br /> <br /> <br /> <br />City Council 22 – 231 4/1/2025
The URL can be used to link to this page
Your browser does not support the video tag.