Laserfiche WebLink
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue <br /> March 3, 2026 <br /> Page 3 <br /> advertised in PlanetBids from November 13, 2025 to December 11, 2025. Bids were <br /> received electronically via PlanetBids on December 11, 2025. <br /> A copy of construction plans, contracts, specifications, and all related reference <br /> materials (such as The Greenbook) are available for public review at the City's Public <br /> Works Agency, Central Files office located in City Hall. <br /> Bid Results Summary <br /> RANK BIDDER'S NAME LOCATION BASE BID + <br /> ALTERNATES <br /> 1 Onyx Paving Company, Inc. Yorba Linda, CA $2,728,000 <br /> 2 R.J. Noble Company Orange, CA $ 2,742,000 <br /> 3 Hardy & Harper, Inc. Lake Forest, CA $ 2,980,000 <br /> 4 Toro Enterprises, Inc. Oxnard, CA $ 3,207,010 <br /> 5 Vido Samarzich, Inc. Santa Ana, CA $ 3,241,720 <br /> 6 Excel Paving Co. Long Beach, CA $ 3,448,860 <br /> 7 All American Asphalt Corona, CA $ 3,461,115 <br /> NR RCCI Azusa, CA Non-Responsive <br /> A total of eight (8) bids were received and seven (7) were deemed responsive. Staff <br /> determined that RCCI's bid was non-responsive because it did not meet contract <br /> specification requirements to self-perform more than 50% of the total contract value. <br /> Onyx Paving Company, Inc. submitted the lowest responsive base bid in the amount of <br /> $2,673,000 (Exhibit 3). As specified in the bid documents, the lowest bid shall be <br /> determined on the basis of the Base Bid. The add-alternate scope of work in the bid <br /> package is the installation of a traffic video detection system at Fairview Street and <br /> Segerstrom Avenue to improve traffic control. The total bid including the add-alternate <br /> scope of work is in the amount of $2,728,000 and still collectively lower than the other <br /> bids including the alternative. Based on the bid analysis and a contractor's reference <br /> check, staff recommends awarding the construction contract, including the add-alternate <br /> scope, to Onyx Paving Company, Inc. (Exhibit 4). <br /> Onyx Paving Company, Inc. has previously performed work as a prime contractor in the <br /> City of Santa Ana within the past three (3) years, including two Local Street <br /> Preventative Maintenance Projects and the Fremont Elementary and Spurgeon <br /> Intermediate Safe Routes to School Projects. The Contractor satisfactorily completed <br /> these projects and staff recommends awarding the construction contract to Onyx Paving <br /> Company, Inc. for the construction of the Project. <br /> Project Delivery <br /> To deliver a complete project, in addition to the construction contract, the estimated total <br /> project delivery cost includes a budget allocation for construction administration, <br /> inspection, and testing. Construction administration and inspection may be performed <br /> by either Staff or consultants and includes construction management, inspection of the <br /> City Council 17 — 3 3/3/2026 <br />