My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-03-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Agenda Packet_2026-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 9:30:22 AM
Creation date
2/25/2026 9:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
3/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
when any component of this Project is subject to the approval of Costa Mesa, such approval shall <br /> not be unreasonably withheld. <br /> 5. Costa Mesa will be notified as to the official advertising dates, bid opening date, construction <br /> start date, and overall construction schedule. Also, a representative from Costa Mesa will be <br /> invited to attend pre-construction, Project status, and final walk through meetings. <br /> 6. Change orders for work within Costa Mesa must receive the written approval of the City <br /> Engineer of Costa Mesa or his/her designee prior to implementation. <br /> 7. The following staff members, or as otherwise designated in writing by the Executive Director of <br /> Public Works of Santa Ana or City Engineer of Costa Mesa, shall be the selected representatives <br /> of each City to act on each respective City's behalf with respect to this agreement. Any notices, <br /> requests, approvals, plan submittals or communications shall be provided to each representative <br /> noted below: <br /> City of Santa Ana: City of Costa Mesa: <br /> ATTN.- Rodolfo "Rudy" Rosas, P.E. ATTN: Derek Wieske, P.E. <br /> City Engineer Assistant City Engineer <br /> Public Works Agency Public Works Department <br /> 20 Civic Center Plaza, M-43 77 Fair Drive <br /> Santa Aria, CA 92701 Costa Mesa, CA 92626 <br /> Phone: (714)647-3379 Phone: (714) 754-5291 <br /> E-Mail: rrosas@santa-ana.org E-Mail: derek.wieske@costamesaca.gov <br /> 8. Santa Ana shall cause its contractor for the "Project" to guarantee the Costa Mesa <br /> improvements against defects in workmanship and materials for a period of one (1)year from the <br /> date of acceptance by Santa Ana. It is further agreed that Santa Ana shall assume the <br /> responsibility for causing the Costa Mesa improvements to be brought or restored to full <br /> compliance with the requirements of the Plans and Specifications for any-portion of the Project <br /> which during said one (1) year period are found not to be in conformance with the provisions of <br /> the Plans and Specifications. <br /> 9. The City of Santa Ana shall have its contractor provide insurance as follows: <br /> 9.1 INSURANCE AMOUNTS. Contractor shall procure and maintain for the duration of the <br /> agreement, the following insurance coverages: <br /> 9.2 MINIMUM SCOPE AND LIMIT OF INSURANCE <br /> Contractor shall maintain limits of insurance coverage in the following minimum amounts <br /> and shall be at least as broad as: <br /> Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering <br /> CGL on an "occurrence" basis, including products and completed operations, property <br /> damage, bodily injury and personal&advertising injury with limits no less than $2,000,000 <br /> per occurrence and $4,000,000 aggregate. <br /> Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1 (any <br /> auto),with combined single limits of$1,000,000. In the event Contractor does not maintain <br /> PAGE 2 OF 11 <br /> City Council 17 — 9 3/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.