Laserfiche WebLink
CITY OF SANTA ANA Project No.: 21-6978 <br /> Date Revised: 06/11/25 <br /> Date Reviewed: <br /> COST ESTIMATE <br /> Fairview Road(In the City of Costa Mesa)Rehabilitation <br /> Sunflower Avenue Intersection Improvements <br /> Nif <br /> I- N mMllk�qu*A,�Q,U 6twN <br /> 5 <br /> I Cold Mill(2") SF 9,000 $ 4,680.00 <br /> 2 Asphalt Rubbcr Hot Mix(ARHM) TN 200 $ 33,800.00 <br /> 3 -PCC Curb(Type B-1)(Including Steel Rebar) LF 265 $ 10,600.00 <br /> JColored Concrete-Brick Red,Topcast Exposed <br /> 4 Aggregate Finish(T=4") SF 410 $ 10,300.00 <br /> 5 Signing and Striping US I $ 15,000,00 <br /> W. <br /> tM "U <br /> Design Engineering 5% $ 4,000.00 <br /> Project Administration 5% $ 4,000.00 <br /> Contingency 10% $ 7,000.00 <br /> Construction Engineering 10 $ 7,000. <br /> A <br /> gl 4 <br /> 00 <br /> T <br /> 1 011 Wip J-6 <br /> City Council 17 - 18 3/3/2026 <br />