My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-03-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Agenda Packet_2026-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 9:30:22 AM
Creation date
2/25/2026 9:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
3/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO. 2 <br /> PROPOSAL <br /> PROJECT NO.: 21-6978 <br /> FAIRVIEW STREET REHABILITATION FROM CITY LIMIT TO ALTON AVENUE <br /> Item Description Qty Unit Unit Price Amount <br /> 14 Root Shave* 18 EA $ 1 111 $ ,q ong <br /> 1 <br /> 15 Furnish & Install New Water Valve 20 EA $ <br /> Frame& Cover to Finished Grade 212v0 �`�► 000 <br /> 16 Furnish & Install New Water Meter 3 EA $ $ <br /> Frame&Cover and Adjust to 2, 20o (0/ 600 <br /> Finished Grade <br /> 17 Remove and Install New Fire 4 EA $ $ <br /> Hydrant* 240000 <br /> 18 Adjust Sewer and Drainage Manhole 4 EA $ $ <br /> Frame &Cover to Finished Grade 21 200 $/ 900 <br /> Per C.S.A. STD. 306 Through 308 <br /> 19 Adjust OCSAN Manhole Frame & 6 FA $ $ <br /> Cover to Finished Grade Per STD. �, Op0 q$( 00o <br /> S-050A, S-055, and S-055A <br /> 20 Furnish & Install New#6 Pullbox to 9 EA $ t 1 300 $ <br /> Finished Grade 1\ 1-7 00 <br /> 21 Adjust Survey Monument to l EA $ $ <br /> Finished Grade 2 200 200 <br /> 22 Landscaping & Irrigation 1 LS Z $ <br /> q N 64g -)�9 11('Ha <br /> 23 Construct Parkway Culvert(Type A) 2 EA $ 18 SOp $ 37 000 <br /> i <br /> 24 Install Video Detection System at 1 LS $ 5 5! 000 $ 55 000 <br /> Fairview Street and Alton Avenue r <br /> 25 Furnish & Install Traffic Loops Type 12 EA $ 7 7 7 $ <br /> L <br /> 26 Street Furniture I LS $ <br /> a8,000 2$1000 <br /> 27 Project Advertisement Sign 2 EA $ )� 900 $ S <br /> � 600 <br /> 28 Signing& Striping 1 LS $ It421 000 $ I g21000 <br /> 29 Construction Permit I LS $8,400 $8,400 <br /> City Council P-2 of P47 — 20 3/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.