My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-03-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Agenda Packet_2026-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 9:30:22 AM
Creation date
2/25/2026 9:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
3/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award a Construction Contract to R.J. Noble Company for the Construction of the Grand <br /> Avenue Rehabilitation from Edinger Avenue to McFadden Avenue Project <br /> March 3, 2026 <br /> Page 3 <br /> Project Delivery <br /> To deliver a complete project, in addition to the construction contract, the estimated total <br /> project delivery cost includes a budget allocation for construction administration, <br /> inspection, and testing. Construction administration and inspection may be performed by <br /> either Staff or consultants and includes construction management, inspection of the <br /> Contractor's work to ensure contract compliance, workmanship and quality, materials <br /> testing, and implementation of the labor requirements. <br /> Any of the allocated construction administration funds not spent are considered project <br /> savings and are returned to the respective fund balance upon close out of the project. <br /> As indicated in the Cost Analysis and as summarized in the table below, the estimated <br /> total construction delivery cost of the project is $1,243,213. <br /> Project Item Total <br /> Construction Contract Bid Amount $994,570 <br /> Construction Administration $79,566 <br /> Inspection $49,729 <br /> Testing $19,891 <br /> Unanticipated or Unforeseen Work $99,457 <br /> TOTAL ESTIMATED CONSTRUCTION DELIVERY COST $1,243,213 <br /> Project Schedule and Contract Time <br /> The project is estimated to be completed in July 2026 barring unforeseeable conditions <br /> such as rain, natural disasters, or other delays beyond the control of the City and of the <br /> Contractor. The contract time for this project is 45 working days, as specified in the bid <br /> documents. Working days are counted in accordance with the City's Standard <br /> Specifications, which exclude weekends, City-observed holidays, and inclement weather <br /> days that prevent work. <br /> The contractor was required to submit a construction schedule as part of their bid to <br /> expedite delivery of the project. The projected completion dates based on the submitted <br /> schedule is July 2026, which is within the allotted 45 working days. If the contractor fails <br /> to deliver on time, they will be assessed a penalty of$3,500 per calendar day as specified <br /> in the bid documents. <br /> Project Milestones <br /> Milestone Estimated Notes <br /> Com letion <br /> Administrative Startup March 2026 Contract execution, bonds, <br /> insurance <br /> Material Procurement April 2026 Procurement may take place <br /> concurrently with construction. <br /> City Council 18 — 3 3/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.