Laserfiche WebLink
i >f <br /> Local Project Number:24-SNTA-ECP-4098 Project Title <br /> Additional Project IDs: 24-SNTA-ECP-4098 Santa Ana Zoo Stormwater Capture and Diversion(SAZSCAD)Project <br /> Type of Work: Environmental Cleanup Project Description <br /> Type of Work Description: Environmental Install two underground infiltration units,one hydrodynamic separator,two vegetated swales,and <br /> Cleanup-Detention/Infiltration basins pervious pavement.•Construct a large underground stormwater infiltration system in the primary <br /> parking lot of the Santa Ana Zoo.•Construct a small <br /> Limits FISCAL TOTAL <br /> Caltrans(not considered a joint applicant) <br /> YEAR FUND TYPE EIVG ROW CON/IMP O&M TOTAL ESCALATED <br /> Project Notes 2026 State $0 $0 $3,853,525 $0 $3,853,525 $3,949,863 <br /> Carryforward for active project expenditures, 2026 Environmental Cleanup $0 $0 $2,500,000 $0 $2,500,000 $2,562,500 <br /> pending reimbursements,and/or final invoice. Program(ECP)-Tier 2 <br /> 2026 Other $0 $0 $467,275 $0 $467,275 $478,957 <br /> Totals: $0 $0 $6,820,800 $0 $6,820,800 $6,991,320 <br /> Last Revised:25-00-Accepted Total Programmed:$6,820,800 <br /> TI '37 PLEMENTING AGENCY Santa Ana,City of <br /> Local Project Number: Project Title <br /> Additional Project IDs: Traffic Management Plans <br /> Type of Work: Transportation Planning Project Description <br /> Type of Work Description: Transportation Conduct a variety of traffic counts at various locations Citywide to collect data needed for traffic <br /> Planning-Studies management planning,signal priority studies,signal timing,etc.,preparation of aerial maps,and <br /> management of accident data. <br /> Limits FISCAL TOTAL <br /> FUND TYPE ENG ROW CON/IMP O&M TOTAL <br /> City wide YEAR ESCALATED <br /> Project Notes 2025 Measure M2 Local $60,000 $0 $0 $0 $60,000 $60,000 <br /> Fairshare <br /> Total project budget increased from$420,000 to <br /> $700,000. FY 25-26 CIP 2026 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> 2027 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> 2028 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> 2029 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> 2030 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> 2031 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> 2032 Measure M2 Local $100,000 $0 $0 $0 $100,000 $100,000 <br /> Fairshare <br /> Totals: $760,000 $0 $0 $0 $760,000 $760,000 <br /> t Revised:25-00-Accepted Total Programmed:$760,000 <br /> City Council 20 - 51 3/3/2026 <br />