My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-03-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Agenda Packet_2026-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 9:30:22 AM
Creation date
2/25/2026 9:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
3/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Zoo Overflow Parking Lot Rezone (1801 East Chestnut Avenue) <br /> March 3, 2026 <br /> Page 4 <br /> the Santa Ana Zoo Stormwater Capture and Diversion Project, which includes stormwater <br /> infrastructure improvements within the existing Zoo parking areas. In addition, the Well <br /> 31 PFAS Treatment Project is currently under construction at the Zoo site and includes <br /> installation of a dedicated PFAS water treatment facility, associated mechanical and <br /> electrical systems, and site piping to support long-term groundwater treatment operations <br /> in coordination with the Orange County Water District's regional PFAS program. <br /> Construction activities for the PFAS project include new asphalt paving and pavement <br /> restoration along designated access routes, portions of the Zoo parking lot, and internal <br /> site roadways. <br /> Collectively, these prior planning efforts and infrastructure investments reflect the City's <br /> long-standing use of the Project Site as part of the Zoo's operational and parking system <br /> and demonstrate that the property is an actively planned and improved facility within the <br /> Zoo's broader infrastructure network. The Project Site is located in an urbanized area <br /> bounded by Interstate 5 to the north, East Main Street to the south, the city boundary with <br /> the City of Tustin to the east, and the Santa Ana Zoo to the west, and has historically <br /> functioned as a support facility serving Zoo operations and visitor access. <br /> Analysis <br /> General Plan Amendment (GPA) No. 2025-01 <br /> In accordance with Section 27-12 of the Santa Ana Municipal Code (SAMC), staff <br /> recommends that the City Council adopt a resolution approving GPA No. 2025-01 (Exhibit <br /> 1) to change the land use designation of the Project Site from OS to GC. The GC <br /> designation allows commercial and visitor-serving uses along arterial corridors and would <br /> align the land use designation with the Project Site's existing and continued use as <br /> overflow parking for the Santa Ana Zoo. <br /> [Intentionally Left Blank] <br /> City Council 22 — 4 3/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.