Laserfiche WebLink
Santa Ana Zoo Overflow Parking Lot Rezone (1801 East Chestnut Avenue) <br /> March 3, 2026 <br /> Page 7 <br /> consultation was conducted pursuant to Assembly Bill (AB) 52 and Senate Bill (SB) 18 <br /> with Tribes identified by the Native American Heritage Commission. The NOI was also <br /> filed with the California State Clearinghouse and the Orange County Clerk-Recorder's <br /> Office. The NOI identified the availability of the Draft IS/MND and provided details on <br /> where electronic copies could be accessed on the City's website, as well as the locations <br /> where hard copies were available for public review, including the Public Works Agency <br /> counter and the Southwest Senior Center. <br /> A copy of the public notice is provided attached to this staff report as Exhibit 4. Vicinity <br /> zoning and aerial view, including the 2,000-foot notification radius map, are provided in <br /> Exhibit 5. At the time this report was printed, no issues of concern had been raised by <br /> the public regarding the requested actions. <br /> ENVIRONMENTAL IMPACT <br /> Pursuant to Section 21081.6 of CEQA and Section 15097 of CEQA Guidelines, a MMRP <br /> is required when a MND is certified in conjunction with project approval. The purpose of <br /> the MMRP is to ensure that all adopted mitigation measures are implemented during <br /> project construction and operation and that potential environmental impacts are reduced <br /> to less-than-significant levels. <br /> An IS/MND was prepared for the Project in accordance with CEQA (Exhibit 6). The <br /> IS/MND concluded that implementation of the proposed Project, and parking lot <br /> improvements, could result in potentially significant environmental impacts; however, with <br /> implementation of identified mitigation measures and compliance with applicable <br /> conditions of approval, all impacts would be reduced to a less-than-significant level. The <br /> City of Santa Ana is the Lead Agency for the Project pursuant to Section 15367 of the <br /> CEQA Guidelines. <br /> The MMRP prepared for the project, attached hereto as Exhibit 7, documents the <br /> mitigation measures adopted for the Project, identifies the responsible parties, and <br /> specifies the timing and method of implementation to ensure compliance during project <br /> implementation. The MMRP does not address environmental topic areas that were <br /> determined in the IS/MND to result in less-than-significant impacts for which no <br /> mitigation was required. Based on the analysis contained in the IS/MND, adoption of the <br /> MMRP will ensure that all applicable mitigation measures are implemented and that the <br /> proposed Project will not result in significant environmental impacts. As such, a Notice <br /> of Determination, Environmental Review No. 2025-119, will be filed for this project. <br /> FISCAL IMPACT <br /> There is no fiscal impact associated with these actions. <br /> EXHIBIT(S) <br /> 1. Resolution Approving GPA No. 2025-01 <br /> 2. Ordinance Approving AA No. 2025-02 <br /> City Council 22 — 7 3/3/2026 <br />