My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-03-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Agenda Packet_2026-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 9:30:22 AM
Creation date
2/25/2026 9:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
3/3/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
817
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
peak demand. Onsite chlorine generation provides a dependable and cost-effective <br /> disinfection method, guaranteeing safe water even during supply chain disruptions. By <br /> reducing dependence on imported water, the project supports rate stability. <br /> At the community level, <br /> recreational and environmental <br /> upgrades were delivered, including <br /> resurfaced and repainted <br /> basketball, tennis, and volley ball <br /> courts, renovated lighting for <br /> evening use, new fencing with <br /> privacy screening, and permeable <br /> asphalt in the Morrison Park �- <br /> parking lot to improve storm water <br /> recharge replenishing <br /> underground aquifers. Together, <br /> these improvements enhance „Above: Picture of a new vertical turbine pump and high-efficiency <br /> water reliability, recreational motor installed at Well 32 (Left); Picture of court resurfacing and <br /> spaces, and environmental restoration (Right). <br /> stewardship, significantly elevating <br /> quality of life across the City. <br /> FVJ Median Improvements <br /> The City continues to enhance street medians that ., <br /> were left in desolate conditions following the State <br /> of California's water restrictions nearly ten years <br /> ago. These improvements will be implemented <br /> over a three-year period and are intended to <br /> enhance the public realm, creating a more <br /> attractive environment. The project scope includes <br /> the installation of low-maintenance, drought- <br /> tolerant, and resilient plant materials, as well as - r <br /> the repair and/or upgrade of irrigation systems <br /> where applicable. <br /> As of 2025, the City of Santa Ana's Public Works <br /> Agency has improved approximately 2.12 miles of <br /> previously barren or non-landscaped medians. --- <br /> Efforts have focused on Edinger Avenue (from <br /> Grand Avenue to Bristol Street) and Bristol Street <br /> (from Sunflower Avenue to Alton Avenue), with „Above: Picture of improved median. <br /> improvements on both streets completed in <br /> December 2025. <br /> 29 <br /> City Council 10 — 37 3/3/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.