|
City of Santa Ana
<br />Fairview Street Rehabilitation from South CRy Limits to Alton Avenue (Pmject#21-6978), bidding on 12/11/2D25 2:00 PM (PST)
<br />Page 2 of 3
<br />Printed D 1/23/2026
<br />Line Items
<br />Discount Terms No Discount
<br />- ------------
<br />item - item
<br /># ; Code Type, Item Description
<br />OOM'; QTY
<br />i Unit Price Line Total 111 i
<br />TOTALBASEBID
<br />----- .----- -------- ------ _.._-------- -._...._...__....__... ...... .... ...... ...._..___--_____.__..._._...__'---_--_--__.___..__..___....__.__.___.._._..__:.____.__..._..-.---
<br />i $2,673,000.00 i
<br />_._,.,._..._.._.._.._.._.;.__...__..
<br />1
<br />_ _.__ . _..._..._.. _._. _._.._._.__._ _..._._.__-. _._.._. _._. _._...._..._...._._..._._.__......__...__._.._..._....... -.................. ............................._.._..._......
<br />i Unclassified Excavation
<br />___...�._._.._.
<br />i CY 1700
<br />__,_.__.__...__...J....._._....._._..._._. _i .___.
<br />814200 1 $241A00.60 ; Yes
<br />2
<br />! AC Pavement•
<br />', TN Iwo$169.00
<br />$270,400.00 Yes
<br />3 i
<br />' Cold Mill, (P9•
<br />i SF 1261000 1: $0 63 $164,430A0 Yes
<br />4 —
<br />;Asphalt Rubber No[M6c(ARHM)•
<br />!
<br />tN 3300
<br />1
<br />j 514&00 I $488,400.00 i Ye
<br />s i
<br />j PCC sidewalk(T-4")•
<br />SF 6200
<br />._
<br />$13.00 1 $80.600.0o Yes
<br />6 !
<br />' 9" Thick PCC Pavement with Dowels
<br />i SF i 200
<br />i 533.00 $6,600.00 j Yes
<br />7 !
<br />! PCC Driveway Approach (Commercial=8'•
<br />_ SFY =600
<br />$28.00 576,900.00 i Yes
<br />PCC Curb Ramp (Caltrans STD. A89Q
<br />.... ........ -._-___-__.—.—___-.-_
<br />SP 400
<br />1$28.00 $11,200AC Yes
<br />9 (
<br />PCC Curb and Gutter (Type A-2.8)•
<br />LF 2000
<br />!$63A0 $126,000.00 Yes
<br />10
<br />PCC Curb (Type Bd) (including Steel Reber)
<br />- LF ! 5200
<br />J
<br />i $48.00 1 $249,600.00 I Yes
<br />Colored Concrete - Brick Red, Topcast Exposed Aggregate Finish(T-4")
<br />ASP j5600
<br />1$15.00 I$84,000.00 jYes
<br />12 1
<br />PCCCross.Gutter(A[teriatStroet)
<br />SF 500
<br />1$28.00 $14,000.00_ Yes
<br />13 i
<br />! Concrete Bus Pad -�-- —�_-� _- - �— -`�`--
<br />Si 33100
<br />—
<br />1 S33A0 $102,300AD Yes
<br />141
<br />Root shave- ---^_---
<br />EA 7B
<br />1 $1,111.00 $19,998.00 1 Yes
<br />15 i !
<br />; Furnish & install Now Water Valve Frame & Cover to Finished Grade -_
<br />: EA' 20 ! 52,200.00 j $44p60.00 _ ;Yes
<br />16 1
<br />? Furnish and Install New Water Meter Frame & Cover and Adjust to Finished Grade
<br />EA ; 3
<br />$2,200.00 $6,600.60 ! Yes
<br />17 !
<br />1 Remove and install New Fire Hydrant• , EA 14
<br />$24AD0.00 1 596,006A0 1 Yes
<br />18 t !
<br />Adjust Sewer and Drainage Manhole Frame& Cover to Finished Grade Per C.S.A. STD. 306 Through 308
<br />;EA 14
<br />I$2,200.00 1sBA"A0 ,Yes
<br />19 ! 1 Adjust OCSAN Manhole Frame & Cover to Finished Grade Per STD. 5-050A, 5-055, and S-055A
<br />- EA { 6
<br />- $8,000.00 1 $48,000.00 Yes
<br />20 l i
<br />- _.1
<br />E Furnish & Install New #6 Pullbox to Finished Grade
<br />_...-.—__.______.............___.._._.___.._.-___.....__..__...__.,._.__R___..___.,...__.-.......__—.
<br />j EA 9
<br />f $1,300.00 yL$11,700.00 I Yes
<br />21 {
<br />Adjust Survey Monument to Finished Grade
<br />1EA I1
<br />($2900.00 $2,200A0 1Yes
<br />22
<br />;Landscaping& irrigation
<br />I LS ! 1
<br />(5294.648.00 $294,648.00 I Yes
<br />23
<br />�- -_��-
<br />I Construct Parkway Culvert (Type A)
<br />FA 12
<br />i $18,500.00 $37,000.00 ;Yes
<br />24
<br />i lastalWiden Detection Systemat Fairview Street and Alton Avenue
<br />�.LS '1
<br />J _.
<br />�SS5,000.00 �555,000.00 Yes
<br />I
<br />25 !
<br />1
<br />i
<br />Furnish & Install Traffic Loops Type E
<br />EA ! 12
<br />,
<br />$777.00 I $9,324A0 Yes
<br />- ._..___-..._.._�...___.__-_�_.._
<br />26 f
<br />_
<br />1 Street Furniture -
<br />LS i 1
<br />I $28,000.66 $28,000.06 1 Yes
<br />27 1 i
<br />Project Advertisement Sign -
<br />j EA 2
<br />$2,800.000 J S5,600.00 j Yes
<br />28 i
<br />j 5igning &Striping
<br />LS ! 1
<br />$142,O0OA0 I $142,000.00 Yes
<br />29 !
<br />I Construction Permit
<br />LS ; 1
<br />1$8A00.00 i 58,400.00 i Yes
<br />ADD ALTERNATE SID
<br />$55,000.00
<br />30
<br />Install Video Detection System at Fairview Street and 5egarstromAvenue
<br />_-__^---
<br />LS ii
<br />4-
<br />,565,000.00 $55,000.00 IYes
<br />^-
<br />NOTES
<br />$0.00
<br />31 i
<br />i Asterisk Notes per P-3 of Specifications
<br />HA .0
<br />1$0 eo ' 50.00 -. Yes
<br />32
<br />—_...__ . _ _. __. _ .--_.._._- .__. ....
<br />�• The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the n2SW'limit as stated
<br />In Section 7-35 of the Standard Specifications. The actual amount for this Item will be dictated by the actual quantity used, iNA i0
<br />i$0.00 j$0.00 Yes
<br />and the Agency reserves the right to Increase or decrease the quantity of this item accordingly._.._ . _
<br />i-_.___-. __._..._- -._ ..______ .____. _ ____- _ __-_-...-_.._.._.._
<br />i
<br />....._. _--_
<br />i 1 j
<br />t_______. ------
<br />PlanetBids
<br />
|