Laserfiche WebLink
Fairview Street Rehabilitation from Southern City Limits to Alton Avenue <br />March 3, 2026 <br />Page 3 <br />advertised in PlanetBids from November 13, 2025 to December 11, 2025. Bids were <br />received electronically via PlanetBids on December 11, 2025. <br />A copy of construction plans, contracts, specifications, and all related reference <br />materials (such as The Greenbook) are available for public review at the City's Public <br />Works Agency, Central Files office located in City Hall. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID + <br />ALTERNATES <br />1 <br />Onyx Paving Company, Inc. <br />Yorba Linda, CA <br />$2,728,000 <br />2 <br />R.J. Noble Company <br />Orange, CA <br />$ 2,742,000 <br />3 <br />Hardy & Harper, Inc. <br />Lake Forest, CA <br />$ 2,980,000 <br />4 <br />Toro Enterprises, Inc. <br />Oxnard, CA <br />$ 3,207,010 <br />5 <br />Vido Samarzich, Inc. <br />Santa Ana, CA <br />$ 3,241,720 <br />6 <br />Excel Paving Co. <br />Long Beach, CA <br />$ 3,448,860 <br />7 <br />All American Asphalt <br />Corona, CA <br />$ 3,461,115 <br />NR <br />RCCI <br />Azusa, CA <br />Non -Responsive <br />A total of eight (8) bids were received and seven (7) were deemed responsive. Staff <br />determined that RCCI's bid was non -responsive because it did not meet contract <br />specification requirements to self -perform more than 50% of the total contract value. <br />Onyx Paving Company, Inc. submitted the lowest responsive base bid in the amount of <br />$2,673,000 (Exhibit 3). As specified in the bid documents, the lowest bid shall be <br />determined on the basis of the Base Bid. The add -alternate scope of work in the bid <br />package is the installation of a traffic video detection system at Fairview Street and <br />Segerstrom Avenue to improve traffic control. The total bid including the add -alternate <br />scope of work is in the amount of $2,728,000 and still collectively lower than the other <br />bids including the alternative. Based on the bid analysis and a contractor's reference <br />check, staff recommends awarding the construction contract, including the add -alternate <br />scope, to Onyx Paving Company, Inc. (Exhibit 4). <br />Onyx Paving Company, Inc. has previously performed work as a prime contractor in the <br />City of Santa Ana within the past three (3) years, including two Local Street <br />Preventative Maintenance Projects and the Fremont Elementary and Spurgeon <br />Intermediate Safe Routes to School Projects. The Contractor satisfactorily completed <br />these projects and staff recommends awarding the construction contract to Onyx Paving <br />Company, Inc. for the construction of the Project. <br />Proiect Delive <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes a budget allocation for construction administration, <br />inspection, and testing. Construction administration and inspection may be performed <br />by either Staff or consultants and includes construction management, inspection of the <br />