My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Cooperative Cost Reimbursement Agreement for the Fairview Street Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/03/2026 Regular
>
Item 17 - Cooperative Cost Reimbursement Agreement for the Fairview Street Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 10:14:10 AM
Creation date
2/25/2026 9:43:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/3/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE COST REIMBURSEMENT AGREEMENT <br />FOR FAIRVIEW STREET REHABIL.IATION FROM SOUTH CITY LIMIT (SUNFLOWER <br />AVENUE) TO ALTON AVENUE <br />COOPERATIVE COST REIMBURSEMENT AGREEMENT ("Agreement"), is made and entered <br />into this day of — 2025, by and between the CITY OF SANTA ANA, a <br />California charter city ("Santa Ana"), and the CITY OF COSTA MESA, a California municipal <br />corporation ("Costa Mesa"). Related work on the project will include pavement grind and overlay, <br />reconstruction of curb median with irrigation and landscaping, curb and gutter, driveways, bus <br />pads, sidewalk repair, replacement of curb ramps to be in compliance with federal Americans with <br />Disabilities Act requirements, signing and striping, and adjustment of manholes and water valves <br />to grade. In this Agreement, Santa Ana and Costa Mesa may each be individually referred to as <br />a "Party" and collectively referred to as the "Parties." <br />RECITALS: <br />WHEREAS, Santa Ana has initiated a street rehabilitation project (the "Project') to <br />improve the pavement condition of Fairview Street from South City Limits (Sunflower Avenue) to <br />Alton Avenue. <br />WHEREAS, Fairview Street within the Project limits contain a portion of property within <br />Santa Ana and a portion of the street within the boundary of Costa Mesa; and <br />WHEREAS, In an effort to efficiently utilize Costa Mesa resources, Costa Mesa wishes to <br />improve a portion of Fairview Road within its boundary at the same time the Santa Ana Fairview <br />Street Rehabilitation Project are conducted; and <br />WHEREAS, the Parties desire to repave Fairview Street (Fairview Road in the City of <br />Costa Mesa), within their respective boundaries as part of the "Project'. <br />NOW, THEREFORE, based upon the foregoing Recitals, and for good and valuable <br />consideration, the receipt and sufficiency of which is acknowledged by all Parties, the Parties <br />agree as follows: <br />1. Santa Ana will advertise for bids, hire a contractor, approve the work and administer the <br />contract for street rehabilitation. <br />2. Costa Mesa is responsible for funding that portion of the Project within the Costa Mesa city <br />limits, as set forth in Exhibit A & B, attached hereto and incorporated by this reference. Costa <br />Mesa will remit payment to Santa Ana within ninety (90) days of receipt of invoice evidencing <br />Project work performed within Costa Mesa city boundary. The total project cost for the City of <br />Costa Mesa under this agreement shall not exceed $96,000.00. <br />3. Santa Ana shall coordinate the relocation of all affected utility company facilities within the city <br />limits of Costa Mesa in a timely manner. <br />4. Santa Ana and Costa Mesa shall extend cooperation to each other and proceed under this <br />Agreement in good faith to facilitate timely completion of the "Project'. The Parties agree that <br />PAGE 1 OF 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.