Laserfiche WebLink
EXHIBIT 4 <br />Orange County Transportation Authority <br />FY 2025/26 - FY 2031/32 Capital Improvement Program <br />TIP ID CP-12674 <br />IMPLEMENTING AGENCY <br />Santa Ana, City of <br />Local Project Number: <br />Project Title <br />Additional Project IDs: 24-SNTA-ECP-4092 <br />10th and Flower Stormwater Capture Project <br />Type of Work: Environmental Cleanup <br />Project Description <br />Type of Work Description: Environmental <br />The City of Santa Ana proposes to install one HDS, two Catch Basin Filter Inserts, three <br />Bioretention <br />Cleanup - Other <br />Basins, and two Underground Infiltration Systems. The multi -benefit project features the installation of <br />stormwater BMPs, designed to capture and in <br />Limits <br />FISCAL <br />YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL <br />TOTAL <br />ESCALATED <br />10th and Flower Street <br />Project Notes <br />2026 Environmental Cleanup $0 $0 $600,000 $0 $600,000 <br />(ECP) - Tier 1 <br />$615,000 <br />CarryProgram <br />for active project expenditures, <br />wardreimbursements, <br />pending <br />pending reimbursements, and/or final invoice. <br />2026 Other $0 $0 $750,500 $0 $750,500 <br />$769,262 <br />Last Revised: 25-00 - <br />Totals: $0 $0 $1,350,500 $0 $1,350,500 $1,384,262 <br />Total Programmed: $1,350,500� <br />Tip rr ^^ i?tiro <br />IMpI_EMENTIMr nrF=Mry Banta Ana, City of <br />Local Project Number: <br />Project Title <br />Additional Project IDs: <br />1st St Traffic Safety Corridor Street Light Improvements <br />Type of Work: Safety <br />Project Description <br />Type of Work Description: Safety - Improve <br />Installation of Street Lights poles, LED lights, underground conduits and wiring, and new electrical <br />lighting of roadway <br />meter pedestals. <br />Limits <br />FISCAL TOTAL <br />FUND TYPE ENG ROW CON/IMP O&M TOTAL <br />First Street between Harbor Blvd to Susan Street <br />YEAR ESCALATED <br />and First Street between Fairview Street and <br />2026 Measure M2 Local $5,000 $0 $270,600 $0 $275,600 $282,365 <br />Center Street. <br />Fairshare <br />Project Notes <br />FY 25-26 CIP <br />Totals: $5,000 $0 $270,600 $0 $275,600 $282,365 <br />Last Revised: 25-00 -Accepted <br />Local Project Number: <br />Additional Project IDs: <br />Type of Work: Road Maintenance <br />Type of Work Description: Road Maintenance - <br />Rehabilitation of roadway <br />Limits <br />Main Place to North City Limits, asphalt area only. <br />Project Notes <br />Carry forward for active project expenditures. FY <br />24-25 CIP; carryforward FY 23-24 amount for <br />active project expenditures. <br />Last Revised: 25-00 - <br />Total Programmed: $275,600 <br />Project Title <br />Bedford Rd Rehabilitation: Main PI to North City Limit <br />Project Description <br />Reconstruction/resurfacing of existing pavement and replacement/installation of missing or damaged, <br />curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this segment of <br />roadway. <br />FISCAL TOTAL <br />YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED <br />2025 Measure M2 Local $0 $0 $40,000 $0 $40,000 $40,000 <br />Fairshare <br />Totals: $0 $0 $40,000 $0 $40,000 $40,000 <br />Total Programmed: $40L0 <br />