EXHIBIT 4
<br />Orange County Transportation Authority
<br />FY 2025/26 - FY 2031/32 Capital Improvement Program
<br />TIP ID CP-12674
<br />IMPLEMENTING AGENCY
<br />Santa Ana, City of
<br />Local Project Number:
<br />Project Title
<br />Additional Project IDs: 24-SNTA-ECP-4092
<br />10th and Flower Stormwater Capture Project
<br />Type of Work: Environmental Cleanup
<br />Project Description
<br />Type of Work Description: Environmental
<br />The City of Santa Ana proposes to install one HDS, two Catch Basin Filter Inserts, three
<br />Bioretention
<br />Cleanup - Other
<br />Basins, and two Underground Infiltration Systems. The multi -benefit project features the installation of
<br />stormwater BMPs, designed to capture and in
<br />Limits
<br />FISCAL
<br />YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />TOTAL
<br />ESCALATED
<br />10th and Flower Street
<br />Project Notes
<br />2026 Environmental Cleanup $0 $0 $600,000 $0 $600,000
<br />(ECP) - Tier 1
<br />$615,000
<br />CarryProgram
<br />for active project expenditures,
<br />wardreimbursements,
<br />pending
<br />pending reimbursements, and/or final invoice.
<br />2026 Other $0 $0 $750,500 $0 $750,500
<br />$769,262
<br />Last Revised: 25-00 -
<br />Totals: $0 $0 $1,350,500 $0 $1,350,500 $1,384,262
<br />Total Programmed: $1,350,500�
<br />Tip rr ^^ i?tiro
<br />IMpI_EMENTIMr nrF=Mry Banta Ana, City of
<br />Local Project Number:
<br />Project Title
<br />Additional Project IDs:
<br />1st St Traffic Safety Corridor Street Light Improvements
<br />Type of Work: Safety
<br />Project Description
<br />Type of Work Description: Safety - Improve
<br />Installation of Street Lights poles, LED lights, underground conduits and wiring, and new electrical
<br />lighting of roadway
<br />meter pedestals.
<br />Limits
<br />FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />First Street between Harbor Blvd to Susan Street
<br />YEAR ESCALATED
<br />and First Street between Fairview Street and
<br />2026 Measure M2 Local $5,000 $0 $270,600 $0 $275,600 $282,365
<br />Center Street.
<br />Fairshare
<br />Project Notes
<br />FY 25-26 CIP
<br />Totals: $5,000 $0 $270,600 $0 $275,600 $282,365
<br />Last Revised: 25-00 -Accepted
<br />Local Project Number:
<br />Additional Project IDs:
<br />Type of Work: Road Maintenance
<br />Type of Work Description: Road Maintenance -
<br />Rehabilitation of roadway
<br />Limits
<br />Main Place to North City Limits, asphalt area only.
<br />Project Notes
<br />Carry forward for active project expenditures. FY
<br />24-25 CIP; carryforward FY 23-24 amount for
<br />active project expenditures.
<br />Last Revised: 25-00 -
<br />Total Programmed: $275,600
<br />Project Title
<br />Bedford Rd Rehabilitation: Main PI to North City Limit
<br />Project Description
<br />Reconstruction/resurfacing of existing pavement and replacement/installation of missing or damaged,
<br />curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this segment of
<br />roadway.
<br />FISCAL TOTAL
<br />YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
<br />2025 Measure M2 Local $0 $0 $40,000 $0 $40,000 $40,000
<br />Fairshare
<br />Totals: $0 $0 $40,000 $0 $40,000 $40,000
<br />Total Programmed: $40L0