IMPLEMENTING AGENCY Santa Ana, City of
<br />Local Project Number: 24-SNTA-ACE-4064
<br />Project Title
<br />Additional Project IDs:
<br />Dyer Road Improvements (55 Freeway - 700' E/O Pullman)
<br />Type of Work: Road Widening
<br />Project Description
<br />Type of Work Description: Road Widening -Add
<br />The project will consist of pavement improvements, curb and gutter, driveways, manholes adjustments,
<br />2 lanes to existing roadway in project limits
<br />wheel chair ramps, sidewalk, additional through lanes eastbound and westbound, bike lanes with a
<br />bike lane buffer, and landscaping
<br />Limits
<br />FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />Dyer Road from the 55 Freeway to 700' east of
<br />YEAR
<br />ESCALATED
<br />Pullman Street.
<br />Arterial Capacity
<br />Project Notes
<br />2025 Enhancements $2,365,200 $0 $0 $0
<br />$2,365,200 $2,365,200
<br />(ACE)
<br />FY 25-26 CIP
<br />Measure M2 Local
<br />2026 Fairshare $788,400 $0 $0 $0
<br />$788,400 $788,400
<br />2027 Other $0 $3,828,042 $0 $0
<br />$3,828,042 $4,021,837
<br />2027 Unfunded/Unknown $0 $11,484,125 $0 $0
<br />$11,484,125 $12,065,509
<br />2028 Unfunded/Unknown $0 $0 $13,499,993 $0
<br />$13,499,993 $14,538,016
<br />2028 Other $0 $0 $4,499,997 $0
<br />$4,499,997 $4,846,005
<br />Last Revised: 25-00 -
<br />Totals: $3,153,600 $15,312,167 $17,999,990 $0 $36,465,757 $38,624,967
<br />Total Programmed: $36,465,757�
<br />TIP ID CP-12036
<br />IMPLEMENTING AGENCY Santa Ana, City of
<br />Local Project Number:
<br />Project Title
<br />Additional Project IDs:
<br />Fairview Bridge and Street Improvements
<br />Type of Work: Road Widening
<br />Project Description
<br />Type of Work Description: Road Widening -Add
<br />The proposed improvements would include the widening of Fairview Street with a cross section of 100'
<br />2 lanes to existing roadway in project limits
<br />wide right-of-way and will include 3 lanes in each direction, raised median, Class II bike lane, and 8'
<br />wide sidewalk with tree wells.
<br />Limits
<br />FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />YEAR ESCALATED
<br />Fairview Bridge
<br />Project Notes
<br />2025 Measure M2 Local $0 $0 $4,263,263 $0 $4,263,263 $4,263,263
<br />Fairshare
<br />FY 25-26 CIP; carryforward FY 23-24 amount for
<br />active project expenditures.
<br />2026 Measure M2 Local
<br />$350,000 $0 $0 $0 $350,000 $350,000
<br />Fairshare
<br />Last Revised: 25-00 -
<br />Totals: $350,000 $0 $4,263,263 $0 $4,613,263 $4,613,263
<br />Total Programmed: $4,613,263I
<br />TIP ID CP--3616
<br />IMPLEMENTING AGENCY
<br />Santa Ana, City of
<br />Local Project Number: 22-SNTA-ACE-4020
<br />Project Title
<br />Additional Project IDs: 25-SNTA-ACE-5005
<br />Fairview St. Improvements (Monte
<br />Carlo Drive to Trask Street)
<br />Type of Work: Road Widening
<br />Project Description
<br />Type of Work Description: Road Widening -Add
<br />Widen Fairview Street between Monte Carlo Drive and Trask Avenue from a four -lane
<br />roadway to a
<br />1 lane to existing roadway in project limits
<br />six -lane arterial to provide adequate vehicular capacity within the City northern limits.
<br />Limits
<br />FISCAL
<br />FUND TYPE
<br />YEAR
<br />ENG ROW CON/IMP O&M TOTAL
<br />TOTAL
<br />ESCALATED
<br />Monte Carlo to Trask Street
<br />Project Notes
<br />2026 Arterial Capacity
<br />$0 $5,148,290 $0 $0 $5,148,290
<br />$5,276,997
<br />Enhancements (ACE)
<br />Carryforward for active project expenditures,
<br />Measure M2 Local
<br />pending reimbursements, and/or final invoice.
<br />2026
<br />$0 $0 $0 $0 $0
<br />$0
<br />ROW funded in 2025 Call. Construction phase is
<br />Fairshare
<br />unfunded.
<br />2026 Other
<br />$0 $1,716,097 $0 $0 $1,716,097
<br />$1,758,999
<br />2027 Unfunded/Unknown
<br />$0 $0 $4,441,481 $0 $4,441,481
<br />$4,666,331
<br />2027 Other
<br />$0 $0 $1,480,494 $0 $1,480,494
<br />$1,555,444
<br />Last Revised: 25-00 -
<br />Totals: $0 $6,864,387 $5,921,975 $0 $12,786,362 $13,257,771
<br />Total Programmed: $12,786,362�