Laserfiche WebLink
IMPLEMENTING AGENCY Santa Ana, City of <br />Local Project Number: 24-SNTA-ECP-4098 <br />Additional Project IDs: 24-SNTA-ECP-4098 <br />Type of Work: Environmental Cleanup <br />Type of Work Description: Environmental <br />Cleanup - Detention/Infiltration basins <br />Limits <br />Caltrans (not considered a joint applicant) <br />Project Notes <br />Carryforward for active project expenditures, <br />pending reimbursements, and/or final invoice. <br />-st Reviseri- 25-00 -Accepted <br />Project Title <br />Santa Ana Zoo Stormwater Capture and Diversion (SAZSCAD) Project <br />Project Description <br />Install two underground infiltration units, one hydrodynamic separator, two vegetated swales, and <br />pervious pavement. • Construct a large underground stormwater infiltration system in the primary <br />parking lot of the Santa Ana Zoo. • Construct a small <br />FISCAL TOTAL <br />FUND TYPE ENG ROW CON/IMP O&M TOTAL <br />YEAR ESCALATED <br />2026 State $0 $0 $3,853,525 $0 $3,853,525 $3,949,863 <br />2026 Environmental Cleanup $0 $0 $2,500,000 $0 $2,500,000 $2,562,500 <br />Program (ECP) - Tier 2 <br />2026 Other $0 $0 $467,275 $0 $467,275 $478,957 <br />Totals: $0 $0 $6,820,800 $0 $6,820,800 $6,991,320 <br />Total Programmed: $6,820,800I <br />Local Project Number: <br />Project Title <br />Additional Project IDs: <br />Traffic Management Plans <br />Type of Work: Transportation Planning <br />Project Description <br />Type of Work Description: Transportation <br />Conduct a variety of traffic counts at various locations Citywide to collect data needed for traffic <br />Planning -Studies <br />management planning, signal priority studies, signal timing, <br />etc., preparation of aerial maps, and <br />management of accident data. <br />Limits <br />FISCAL <br />FUND TYPE <br />YEAR <br />TOTAL <br />ENG ROW CON/IMP O&M TOTAL <br />ESCALATED <br />City wide <br />Project Notes <br />2025 Measure M2 Local <br />$60,000 $0 <br />$0 <br />$0 <br />$60,000 $60,000 <br />Total project budget increased from $420,000 to <br />Fairshare <br />$700,000. FY 25-26 CIP <br />2026 Measure M2 Local <br />$100,000 $0 <br />$0 <br />$0 <br />$100,000 $100,000 <br />Fairshare <br />2027 Measure M2 Local <br />$100,000 $0 <br />$0 <br />$0 <br />$100,000 $100,000 <br />Fairshare <br />2028 Measure M2 Local <br />Fairshare <br />$100,000 $0 <br />$0 <br />$0 <br />$100,000 $100,000 <br />2029 Measure M2 Local <br />Fairshare <br />$100,000 $0 <br />$0 <br />$0 <br />$100,000 $100,000 <br />2030 Measure M2 Local <br />$100,000 $0 <br />$0 <br />$0 <br />$100,000 $100,000 <br />Fairshare <br />2031 Measure M2 Local <br />$100,000 $0 <br />$0 <br />$0 <br />$100,000 $100,000 <br />Fairshare <br />2032 Measure M2 Local <br />Fairshare <br />$100,000 $0 <br />$0 <br />$0 <br />$100,000 $100,000 <br />Totals: $760,000 $0 $0 $0 $760,000 $760,000 <br />Last Revised: 25-00 -Accepted Total Programmed: $760,000� <br />