Laserfiche WebLink
Water and Sewer Rates <br />March 17, 2026 <br />Page 7 <br />The sewer enterprise's FY 2025/26 budget includes $8.8 million in operating expenses. <br />Maintenance requirements of the City's sewer system are generally steady and in <br />accordance with the City's adopted Sewer System Management Plan which is on file <br />with the State. Total operating expenses are expected to increase by approximately 4% <br />each year, based on applying specific inflation factors to each budget line item. By the <br />end of the five-year rate -setting period, total operating expenses are expected to reach <br />$10.7 million. At the current revenue rate, present service levels would be unattainable <br />after fiscal year 2029 without completely depleting the reserve balance. <br />Financial Plan <br />The study examined revenue needs over the next 10 years, including expenditures for <br />operations and maintenance, as well as anticipated capital improvements, for the water <br />and sewer enterprises. The main inputs to the financial plan include operating expenses <br />and inflation (including the cost of wholesale water and power), capital investment and <br />funding sources, reserve targets, and debt service coverage requirements. The reserve <br />policy for each utility includes the following three elements: <br />Operating Reserve — three (3) months operating expenses <br />Capital Reserve — 50% of the average annual capital investment over 10 years <br />(i.e. $4 million) <br />Emergency Reserve - $4 million to address unanticipated system needs <br />Revenues for the water and sewer enterprises are not keeping pace with increasing <br />operating costs. As a result, existing revenues do not provide adequate funding to <br />support planned capital improvements or to build and maintain reserve balances at <br />levels recommended by the consultant and consistent with generally accepted industry <br />practices. Over time, this limits the utilities' capacity to reinvest in aging infrastructure or <br />to maintain reserve and debt coverage benchmarks typically reviewed in ongoing <br />evaluations by S&P Global Ratings, which can influence future credit ratings borrowing <br />costs. <br />The study evaluated phased rate adjustments over a five-year period to address these <br />longer -term needs. Under the proposed rate plan, both the water and sewer enterprises <br />are projected to gradually build reserve balances, maintain appropriate debt service <br />coverage, and fund planned capital improvements in a manner that supports reliable <br />service and long-term financial sustainability. <br />In brief, these recommended rates evaluated in the study are intended to: <br />Fully fund utility operations <br />o Costs to replenish the groundwater basin <br />o Costs to purchase imported water <br />o Costs for electrical power <br />