Laserfiche WebLink
SANTA ANA REZONE PROJECT <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />d) Result in other emission (such as those leading to odors) adversely affecting a <br />substantial number of people? <br />Less than significant impact. The proposed project would not be a source of other emissions, such <br />as those leading to odors, during operations. During construction, a limited number of diesel engines <br />would be operating on the project site for limited durations. Diesel exhaust and VOCs from these <br />diesel engines would be emitted during construction of the proposed project, which are objectionable <br />to some; however, the duration of construction activities is expected to be very short (3 months), <br />emissions would disperse rapidly from the project site, and diesel exhaust odors would be consistent <br />with existing vehicle odors in the area. Post -construction, the proposed project would continue to <br />operate as a parking lot and would not be an odor generating use. Considering this information, <br />construction and operation of the proposed project would not create other emissions or odors <br />adversely affecting a substantial number of people; impacts would be less than significant. <br />Mitigation Measures <br />None required. <br />36 FCS <br />Https://adecinnovaticns.sharepoint.com/sites/PubiicationsSite/Shared Documents/Publications/Client(PN-JN)/0327/03270047/ISMND/03270047 Santa Ana Rezone Project ISMND.docx <br />