My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 08 - Ballot Measure Polling Results
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
03/17/2026 Regular, Special HA
>
Item 08 - Ballot Measure Polling Results
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 11:01:15 AM
Creation date
3/11/2026 10:04:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Manager's Office
Item #
08
Date
3/17/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks, Recreation, and <br />Community Services <br />Deferred Maintenance Funds: <br />• The maintenance funds help us address facility maintenance that extend the life of the <br />structures and improve safety for employees, visitors, and animals. The items addressed with <br />Measure X funds over several years would most certainly come up as AZA deficiencies and <br />represent a lack of investment in the ongoing care of our facility. There is always more to do, <br />but this revenue stream is integral to help maintain our facilities when it comes to routine <br />wear and tear. <br />• Updates to zoo office building - <br />• this funding covered the cost of releveling the building foundation <br />o new flooring as the original linoleum flooring was coming up and a tripping hazard <br />• full roof replacement as the building was reroofed over three times already and there <br />were areas where it was buckling <br />• conversion from gas utility to electric since we no longer have a gas service line to the <br />building and thus had no functioning central heat <br />• updates in office restrooms and new water heater <br />• Updates to cafe/gift shop building - <br />• New roof - the old roof leaked and was original to the 1980s building <br />o Replacement of outdated HVAC unit <br />• Updates to veterinary hospital trailer - <br />• Foundation releveling <br />• Exterior painting and repair of siding to weatherproof the structure and extend the life of <br />the building. It looks remarkably good for a 25 year old trailer because of the ongoing <br />maintenance investment which is much less than constructing a brand new building. <br />• Pathway maintenance and repair <br />o Seal coat and repair of asphalt pathways in the zoo to extend their life and lessen tripping <br />hazards <br />Measure X Success 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.