Laserfiche WebLink
Parks, Recreation, and <br />Community Services <br />Deferred Maintenance Funds: <br />• The maintenance funds help us address facility maintenance that extend the life of the <br />structures and improve safety for employees, visitors, and animals. The items addressed with <br />Measure X funds over several years would most certainly come up as AZA deficiencies and <br />represent a lack of investment in the ongoing care of our facility. There is always more to do, <br />but this revenue stream is integral to help maintain our facilities when it comes to routine <br />wear and tear. <br />• Updates to zoo office building - <br />• this funding covered the cost of releveling the building foundation <br />o new flooring as the original linoleum flooring was coming up and a tripping hazard <br />• full roof replacement as the building was reroofed over three times already and there <br />were areas where it was buckling <br />• conversion from gas utility to electric since we no longer have a gas service line to the <br />building and thus had no functioning central heat <br />• updates in office restrooms and new water heater <br />• Updates to cafe/gift shop building - <br />• New roof - the old roof leaked and was original to the 1980s building <br />o Replacement of outdated HVAC unit <br />• Updates to veterinary hospital trailer - <br />• Foundation releveling <br />• Exterior painting and repair of siding to weatherproof the structure and extend the life of <br />the building. It looks remarkably good for a 25 year old trailer because of the ongoing <br />maintenance investment which is much less than constructing a brand new building. <br />• Pathway maintenance and repair <br />o Seal coat and repair of asphalt pathways in the zoo to extend their life and lessen tripping <br />hazards <br />Measure X Success 44 <br />