Laserfiche WebLink
i <br /> Estimated Entity Funded Prior <br /> Description of Improvement Cost(2004 Responsible to Indicated <br /> Dollars) For Triggering <br /> Improvement <br /> 6. Restripe: (1)WB Santa Clara to provide $50,000 Owner Building <br /> one LT lane and one shared LT/RT lane; Permit <br /> (2)NB Grand Avenue from Fruit Street to <br /> 141h Street at Santa Ana Blvd/I-5 HOV <br /> ramps to provide three NB travel lanes;(3) <br /> I-5 NB off-ramps to provide a WB LT lane, <br /> a shared LT/RT Iane and a RT lane at <br /> Grand Ave. <br /> 7. Remove existing on-street parking stalls $300,000 Owner Building <br /> and parking meters on Main Street from Permit <br /> Civic Center Dr. to Buffalo St.,restripe and <br /> slurry seal this Main Street segment to <br /> provide three NB and two SB travel lanes, <br /> and construct median on Main St. south of <br /> loth Street. <br /> 8. Acquire necessary ROW and construct $6,500,000 Owner, Final Map <br /> southbound RT lane at Main/17`h and unless City <br /> Broadway/17`h, including striping,traffic undertakes per <br /> signal modification,and ADA compliant section 5.1.1 <br /> wheel chair ramps. <br /> 9. Implement neighborhood traffic plans to $1,200,000 City Building <br /> mitigate changes in traffic patterns or (actual cost, Permit <br /> increased cut through traffic resulting from not an <br /> the One Broadway Plaza Project in French estimate) <br /> Park,French Court, Willard,Floral Park, <br /> West Floral Park,and Washington Square <br /> Neighborhoods.Traffic plans costs shall <br /> include traffic studies,staff time to process <br /> neighborhood traffic plan, and the <br /> construction of appropriate semi-diverters, <br /> diagonal diverter and street closures. <br />