CITY OF SANTA ANA" ProjeetNo,: 21-6978
<br /> Date Revisedt 06/11/25
<br /> Date Reviewed-
<br /> COST ESTIMATE,
<br /> h'air'vie'►w Street(Tit the City of Santa Ana)Rehabilitation
<br /> South City Limit to Alton Avenue
<br /> I'.'A'i.
<br /> t Unclassified Excavation CY 1,600 $ 384,000.00
<br /> 2 AC Pavement* TN 1,200 $ 189,600.00
<br /> 3 Cold Mill 2'r * SF 240,000 $ 124,800.00
<br /> 4 1Aphalt Rubber Hot Mix(ARHM)* TN 3,300 $ 557 700.00
<br /> 5 PCC Sidewaltc(4")* SF 5,900 $ 82,600.00
<br /> 6 9"Thick PCC Pavement with Dowels SF 200 $ 4,000.00
<br /> 7 PCC Driveway Approach(Commercial=8")* SF 600 $ 12,000.00
<br /> 8 PCC Curb Ramp SF 400 $ 11,600.00
<br /> 9 PCC Curly and Gutter(Type A-2-8)r' LF 21000 $ 164,000.00
<br /> 10 JPCC Curb a B-1)(Including Steel Rebar; LF 5,000 $ 200,000.00
<br /> Colored Concrete-Brick Red,Topca8t Exposed
<br /> I 1 Aggregate Finish(T=4") SF 5200 $ 130,000.00
<br /> 12 PCC Cross-Gutter(Arterial Street) SF 500 $ 14,500.00
<br /> 13 Concrete Bus Pad SF 3,100 $ 170,500.00
<br /> 14 ]toot Shaver' EA u8 $ 15,500.00
<br /> Furnish&Install New Water Valve Frame&Cover
<br /> 15 to Finished Grade EA 22 $ 33,000.00
<br /> Furnish and Install New Wator Meter Frame&Cover
<br /> 1G and Adjust to Finished Grode EA 3 $ 3,600.00
<br /> Adjust Sewer and Drainage 1vlanhole Frame&Cover
<br /> 17 to Finished(bade Per•C.S.A.STD.306 Through 308 EA 4 $ 6,000.00
<br /> Adjust OCSAN Manhole Frame&Cover to Finished
<br /> I8 Grade Per STD,S�050A,5-055,and 5-055A EA 7 $ 14,000.00
<br /> 19 Furnish&install Now 0 Pullbox to Finished Ca'ade EA 5 $ 7,500.00
<br /> 20 Adjust Survey Monument to Finished Grade EA 2 $ 2,800.00
<br /> 21 Landscaping&Irrigation LS 1 $ 432,000.00
<br /> 22 Construct Parkway Culvert(Type A, LA 2 $ 18,000.00
<br /> Install Video Detection System at Fairview Street and
<br /> 23 Se erstrom Avemle LS 1 $ 50,000.00
<br /> Install Video Detection System at Fairview Strcet and
<br /> 24 Alton Avenue LS 1 $ 50,000.00
<br /> Install Video Detection System at Fairviow Street and
<br /> 25 MacArthur Boulevard LS 1 $ 50,000.00
<br /> 26 Furnish&install Traffic Loops Type E EA 12 $ 6,600.00
<br /> 27 Street Furniture LS I $ 85,600.00
<br /> 28 Project AdvertisemcntBign EA 2 $ 4,000.00
<br /> 29 Signing&Striping LS 1 $ 198,500.00
<br /> 30 Construction Permit LS 1 $ 8,400.00
<br /> Y '. 4 {I Lt]w�a H; yr1 hl/s�,rr �Y r r µ 3 r i,3' 4sf
<br /> 'tt�._.a .`S_.�.
<br /> Design Engineering LAWSON $ 90 000.00
<br /> Contingency 109/a $ 303,000A0
<br /> Constnietion Engineorin 15% $ 455,000.00