Laserfiche WebLink
<br /> <br /> <br />Sheets as they exist now or are modified, and shall comply with all other requirements of the <br />Stormwater Permits, as they exist at the time this Lease commences or as the Stormwater Permits <br />may be modified. City agrees to maintain current copies of the BMP Fact Sheets on the Premises <br />throughout the term of this Lease. The BMPs applicable to uses authorized under this Lease must <br />be performed as described within all applicable BMP Fact Sheets. <br /> <br />D. City may propose alternative BMPs that meet or exceed the pollution prevention performance <br />of the BMP Fact Sheets. Any such alternative BMPs shall be submitted to D istrict for review and <br />approval prior to implementation. <br /> <br />E. D istrict may enter the Premises and/or review City <br />conducted on the Premises comply with the requirements of this Clause. City may be required to <br />implement a self-evaluation program to demonstrate compliance with the requirements of this <br />Clause. <br /> <br />F. Among other requirements, the industrial NPDES permit requires periodic stormwater <br />inspections by the State and/or D istrict and/or OC Watersheds staff to ensure facility compliance, <br />which may include annual inspections of the Facilities and Premises, with follow up inspections <br />as a result of observed violations requiring corrective actions. <br /> <br />G. Dependent upon the reuse of the Premises, the Premises shall have a clarifier drain that captures <br />low flow runoff from throughout the site, which ensures all flows are properly drained without any <br />unacceptable runoff. City shall conduct their work throughout the site and any resultant low flow <br />discharges shall work their way to the clarifier. In regard to City Improvements, City shall <br />designate operational zones minimally affected by storm flows that allow drainage to the clarifier, <br />and the non-operational portions of the site are to have normal storm discharges going through the <br />storm drain system. As the site undergoes a new NPDES Industrial Permit application process, <br />these conditions may get re-examined. <br /> <br />H. The BMPs shall stipulate the process for the City to take corrective actions and state the <br />consequences of non-compliance or D istrict options under the Lease to self-remedy the matter. The <br />Santa Ana and San Diego Regional Water Quality Control Boards have established <br />penalties/consequences for non-compliance and those are to be included in this Lease. D istrict to <br />have the option to terminate the Lease if the City does not correct a non-compliance situation in a <br />timely manner. <br /> <br />I. Work activities are to be conducted in a controlled area where pollutants shall be contained, <br />and any heavy metals detected at significantly higher levels than the benchmarks set by the <br />Regional Board shall be addressed. All applicable BMPs are to be properly implemented, <br />including any and all future modifications, updates, or replacement BMPs that may be issued <br />from time to time, shall be used by City. <br /> <br />J. Site modifications, such as distinctly designated work areas with controls to prevent pollutants <br />from escaping and wastewater drain, will be required to be segregated from stormwater drain. <br /> <br />K. In the event City fails to comply with all applicable BMPs, D istrict, in addition to any and all <br />remedies available in Clause 32 (DEFAULTS AND REMEDIES), shall have the right to self-help <br />remedies or terminate the Lease as follows: <br /> 3/2/2026 Page 18 of 41 Lease Number <br />Agency/Program Standard Revenue Lease Form <br /> <br />