Laserfiche WebLink
SANTA ANA REZONE PROJECT <br /> INITIAL STUDYIMITIGATED NEGATIVE DECLARATION <br /> The Southeast District of the SAPD provides police services to the project area. The main SAPD <br /> building is located approximately 1.95 miles northwest from the project site at 60 Civic Center Plaza. <br /> The proposed project would not require the construction of new SAPD facilities or expansion of <br /> existing facilities. Project implementation is not anticipated to increase SAPD response times to the <br /> project site or surrounding vicinity. In addition, the project plans would be reviewed and approved by <br /> the Santa Ana Building and Safety Division and SAPD, which would ensure that adequate safety and <br /> crime prevention measures are provided. <br /> Compliance with the above regulations as well as the City's discretionary review process would <br /> ensure that project implementation would result in a less than significant impact related to fire, police <br /> protection, and emergency services. <br /> c), d), and e) Schools, Parks, and Other Public Facilities? <br /> No impact. The proposed project includes paving of the existing overflow gravel parking lot and <br /> associated access roadway. The proposed project does not include any residential uses and therefore <br /> would not increase the population or demand for schools, parks, or other facilities in the City. <br /> According to the City's General Plan Open Space, Parks and Recreation Element, Santa Ana has <br /> approximately 400 acres of public park and recreation facilities and the City strives to maintain <br /> approximately 2 acres of open space for each 1,000 residents. Santa Ana has population of 310,797 <br /> in 2024. Using the same 400 acres, this results in approximately 1.3 acres of open space for each <br /> 1,000 residents. Currently, the City operates 49 parks and recreational facilities within the City as well <br /> as playgrounds at several schools.As stated above, the proposed project would rezone and repave <br /> an existing overflow parking lot to also provide EV charging stations and solar panel shade structures. <br /> The implementation of the proposed project would not increase population or demand for park <br /> services in the City; therefore, no impact would occur. <br /> The City operates three libraries.The Main Library, which is located at 26 Civic Center Plaza, <br /> approximately 1.94 miles to the northwest of the project site, and the Newhope Library, which is <br /> located at 122 North Newhope Street, approximately 5.08 miles to the west of the project site. The <br /> McFadden Library located in the MIT School Center is located approximately 3.81 miles to the <br /> southwest at 2701 Raitt Street. The population would not increase because of the proposed project <br /> and, therefore, no impacts would occur, <br /> Mitigation Measures <br /> None required. <br /> FCS 89 <br /> Hnps,f/ad¢[Inn6vdSfonssharep9intcom/sidesfPublicailnns5lke/Hhared D,cu to tS/Pvbiications/Client(PN-JNi/C327/43270047/ISMNH/03770077 Santa Ana Hezone Prn,fs}I4Np!gd,nce No, NS-3092 <br /> Page 101 of 118 <br />