My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-3092 - Zone Change for 1801 East Chestut Ave
Clerk
>
Ordinances
>
2021 - 2030 (NS-3001 - NS-XXXX)
>
2026 (NS-3089-NS-XXXX)
>
NS-3092 - Zone Change for 1801 East Chestut Ave
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 10:08:34 AM
Creation date
4/8/2026 10:12:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Agency
Community Development
Date
3/24/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA REZONE PROJECT <br /> INITIAL STUDYIMITIGATED NEGATIVE DECLARATION <br /> v Less than <br /> Significant <br /> Potentially Impact with Less than <br /> Significant Mitigation Significant <br /> Environmental Issues Impact Incorporated Impact No Impact <br /> 2.17 Transportation <br /> Would the project.- <br /> a) Conflict with a program plan, ordinance or ❑ ❑ ® ❑ <br /> policy of the circulation system, including <br /> transit, roadway, bicycle and pedestrian <br /> facilities? <br /> b) Would the project conflict or be ❑ ❑ ® ❑ <br /> inconsistent with CEQA Guidelines <br /> Section 15064.3, subdivision (b)? <br /> c) Substantially increase hazards due to a ❑ ❑ ® ❑ <br /> geometric design feature(e.g., sharp <br /> curves or dangerous intersections) or <br /> incompatible uses (e.g., farm equipment)? <br /> d) Result in inadequate emergency access? ❑ ❑ ® ❑ <br /> Environmental Evaluation <br /> Setti ng <br /> This section is in par based, in part, on the Trip Generation Assessment and the Vehicle Miles <br /> Traveled (VMT) Screening Evaluation prepared for the proposed project by Urban Crossroads, Inc., <br /> on July 23, 2025.11"The Trip Generation Assessment and VMT Screening Evaluation are included in <br /> Appendix E. <br /> Would the project: <br /> a) Conflict with a program plan, ordinance or policy addressing the circulation system, <br /> including transit, roadway, bicycle and pedestrian facilities? <br /> Less than significant impact.According to the Trip Generation Assessment prepared for the <br /> proposed project, the existing use of the project site as an overflow parking lot for the Santa Ana Zoo <br /> currently produces an average of 246 two-way trips per day. Given that the proposed project would <br /> continue to operate as an overflow parking lot for the Santa Ana Zoo, trip generation would be <br /> 3 Urban Crossroads,Inc.2025.Santa Ana Rezone Trip Generation Assessment.July 23. <br /> " Urban Crossroads, Inc.2025.Santa Ana Rezone Vehicle Miles Traveled (VMT)Screening Evaluation.July 23, <br /> 92 FCS <br /> Ordinance No. N s (o at[ons.sF are poln Lcam/sfte,/Publicationssite/Stared raents1Pub11ca1ions(diellt{PN-INI/0377I0327W47/ISMND/03270047 Santa Ana Remne Project 15MMdoca <br /> Page 104 of 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.