Laserfiche WebLink
Material And Force Account Estimate <br />Santa Ana <br />Estimate Number: 137226 Version: 2 <br />Standard Rates: Labor Additive = 223% <br />Estimate Good Until 10/24/25 <br />Location: SANTA ANA IND LD, INDL, 519.08-519.12 <br />Description of Work: 761248L Warner Ave Santa Ana CA 519.1 Santa And Ind Ld <br />Prepared For: Santa Ana <br />Buy America: No <br />COMMENTS FACILITY Description QTY UOM UCST LABOR MATERIAL TOTAL UP %0 Agcy %100 <br />ENGINEERING <br /> Engineering 1 LS 81,135.00 81,135 0 81,135 0 81,135 <br /> Bill Prep Fee - Track Surface RECOLLECT 1 LS 900.00 0 900 900 0 900 <br /> Homeline Freight - Track Surface RECOLLECT 1 LS 900.00 0 900 900 0 900 <br /> Foreign Line Freight - Track Surface RECOLLECT 1 LS 2,976.46 0 2,976 2,976 0 2,976 <br />Sub-Total = 81,135 4,776 85,911 0 85,911 <br />TRACK CONSTRUCTION - COMPANY <br /> Mobilization: Company 1 DA 11,450.00 11,450 0 11,450 0 11,450 <br />RDXING RDXING 136# CON10W PP PAN COMPLETE 224 TF 981.01 120,314 99,431 219,745 0 219,745 <br />TRACK 136# CWRIS0 24-8'6" PPHWD N 16 TP 96 TF 854.06 61,030 20,959 81,989 0 81,989 <br />COMPJT Transition Rail - 136#4 PR 7,694.04 16,259 14,517 30,776 0 30,776 <br />Sub-Total = 209,053 134,908 343,961 0 343,961 <br />TRACK REMOVAL - COMPANY <br />RDXING Remove road crossing - concrete 180 TF 100.73 18,132 0 18,132 0 18,132 <br />TRACK Remove Track 140 TF 44.97 6,295 0 6,295 0 6,295 <br />Sub-Total = 24,427 0 24,427 0 24,427 <br />SITE WORK - CONTRACT <br /> Asphalt: Saw Cut 1 LS 2,500.00 0 2,500 2,500 0 2,500 <br />Sub-Total = 0 2,500 2,500 0 2,500 <br />EQUIPMENT RENTAL <br /> Equipment Rental 5 LS 5,000.00 0 25,000 25,000 0 25,000 <br />Sub-Total = 0 25,000 25,000 0 25,000 <br />Total Wgt. in Tons = 1,413 Totals = 314,615 167,184 481,799 0 481,799 <br />Grand Total = $481,799 <br />Please Note: The above figures are estimates only and are subject to fluctuation. In the event of an <br />increase or decrease in the cost or amount of material or labor required, Santa Ana will pay actual <br />construction costs at the current rates effective thereof. <br /> ______________________________________________________________________________________________________________________________________________________________________________________________ <br /> Thursday, April 24, 2025 Page 1 of 1 <br />EXHIBIT 2 <br />  <br />  <br />City Council 15 – 30 4/21/2026