Laserfiche WebLink
FY 25/26 FY 28/29 FY 29/30 FY 30/31 <br />1,476,525 - - - <br />- - - - <br />1,476,525 - - - <br />FY 25/26 FY 28/29 FY 29/30 FY 30/31 <br />936,955 - - - <br />531,000 - - - <br />8,570 - - - <br />- - - <br />- - - - <br />1,476,525 - - - <br />--- <br />06-Apr-2026 <br />DATE:AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Alex Bangean, Senior Civil Engineer <br />TOTAL - - - <br />- - - <br />TRANSP SYSTEM IMPRV AREA - - - <br />RESIDENTIAL STREET IMPROV - - - <br />SOURCE OF FUNDS FY 26/27 FY 27/28 FY 31/32 <br />OTHER - - - <br />TOTAL - - - <br />PROJECT COSTS FY 26/27 FY 27/28 FY 31/32 <br />Construction - - - <br />- - - <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Warner Avenue between Oak Street and Grand <br />Avenue from 2 to 3 lanes in each direction. The project will also include <br />additional left turn lanes at Grand Avenue, bus pads, raised medians, and <br />a protected bike lane. <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical <br />Report identified the need for Warner Avenue to be widened to a six-lane <br />major arterial to meet MPAH requirements. The existing Average Daily Traffic <br />(ADT) is in excess of 29,600 vehicles per day. The proposed improvements <br />will allow the segment to accommodate future traffic volumes at a Level of <br />Service A and increase operational efficiency. <br />PROJECT TITLE: <br />Warner Ave Impr: Ph 2 - Oak - Grand <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & Widening <br />LOCATION MAP <br />  <br />  <br />City Council 15 – 146 4/21/2026