My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-04-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
04/21/2026 Regular, Special HA
>
Agenda Packet_2026-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2026 10:38:27 AM
Creation date
4/15/2026 9:18:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/21/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award a Construction Contract to Los Angeles Engineering, Inc. for the Construction of <br />the Warner Avenue Improvements (Oak Street to Grand Avenue) Project <br />April 21, 2026 <br />Page 5 <br />5 <br />7 <br />0 <br />3 <br />testing, and implementation of the labor requirements. <br />Any of the allocated construction administration funds not spent are considered project <br />savings and are returned to the respective fund balance upon close out of the project. <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $25,428,000. <br /> <br />Project Item Total <br />Construction Contract Bid Amount $21,190,000 <br />Construction Administration $1,130,133 <br />Inspection $706,333 <br />Testing $282,534 <br />Unanticipated or Unforeseen Work $2,119,000 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY <br />COST $25,428,000 <br />Project Schedule and Contract Time <br />The project completion date is October 2027, barring unforeseeable conditions such as <br />rain, natural disasters, or other delays beyond the control of the City and of the <br />Contractor. The project will be constructed concurrently with Phase 1 improvements <br />such that both phases are completed by October 2027. The contract time for this project <br />is 350 working days, as specified in the bid documents. Working days are counted in <br />accordance with the City’s Standard Specifications, which exclude weekends, City- <br />observed holidays, and inclement weather days that prevent work. <br />The actual completion date will depend on the contractor’s schedule, material <br />procurement timelines, and any unforeseen delays. Based on a typical project timeline, <br />the estimated project completion is provided below; <br />Project Milestones <br />Milestone Estimated <br />Completion <br />Notes <br />Administrative Startup April 2026 Contract execution, bonds, <br />insurance <br />Material Procurement May 2026 Procurement may take place <br />concurrently with construction <br />Contractor Mobilization May 2026 Start of construction activities <br />Project Completion October 2027 Based on 350 working days <br /> <br /> <br />City Council 20 – 5 4/21/2026
The URL can be used to link to this page
Your browser does not support the video tag.