My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PETERSON-CHASE GENERAL ENGINEERING CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:11:32 PM
Creation date
8/18/2010 9:14:23 AM
Metadata
Fields
Template:
Contracts
Company Name
Peterson-Chase General Engineering Construction, Inc.
Contract #
07-2503
Agency
Public Works
Council Approval Date
8/16/2010
Expiration Date
11/30/2012
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?,<. CITY OF SANTA ANA <br />?__ .? <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number PROJECT NO. 07-2503 - SR-55/MacArthur Boulevard Ramps Change Order Number <br />Widening 2 <br />To Peterson-Chase General Engineerin Construction INC. Contractor <br />You are hereby directed to make the herein changes from [he plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICES <br />? . Remove pedestrian crosswalk, traffic signal pedestrian heads, and the curb ramp located at the <br />northbound on ramp at MacArthur Blvd. as directed per City of Santa Ana PCO 9. <br />Agreed Price $? 2, 559.00 <br />2. Provide traffic control on the 55 freeway as directed per City of Santa Ana PCO ? O. <br />Agreed Price $7 ,985.00 <br />3. Remove the existing 2 ball metering heads and replace with 3 ball metering heads as directed <br />per City of Santa Ana PCO ? 1 . <br />Agreed Price $7,300.00 <br />4. Provide and install additional reflector delineators and object markers on MacArthur Blvd. and <br />the northbound and southbound onramps as directed per City of Santa Ana PCO 12. <br />Agreed Price $7 , ? 98.00 <br />5. Replace the southbound metering head and pole as directed per City of Santa Ana PCO ? 3. <br />Agreed Price $3,500.00 <br />6. Provide and install new guardrail on the northbound onramp as directed per City of Santa Ana <br />PCO ? 5. <br />Agreed Price $9,875.00 <br />7. Extend the northbound bridge barrier rail and relocate existing pull boxes as directed per City of <br />Santa Ana PCO ? 6. <br />Agreed Price$33,369.00 <br />Page ? of 2
The URL can be used to link to this page
Your browser does not support the video tag.