Laserfiche WebLink
EXHIBIT A <br />Residential Street Repair <br />Clinton Street Santa Ana side <br />NO. DESCRIPTION UNIT QUANTITY UNIT PRICE COST - <br />1 Unclassified Excavation Cy 75 $51.00 $3,825.00 <br />2 Cold Mill SF 12,883 $1.00 $12,883.00 <br />5 AC Pavement TN 120 $61.50 $7,380.00 <br />6 Remove and Replace PCC Sidewalk SF 125 $6.50 $812.50 <br />7 Remove and Replace PCC Curb & Gutter LF 80 $38.50 $3,080.00 <br />13 Adjust Water Valve Frame and Cover to Grade EA 4 $571.00 $2,284.00 <br />14 Root Shave EA 4 $248.50 $994.00 <br />15 Furnish and Install Traffic Loops EA 4 $204.50 $818.00 <br />17 Signing and Striping . LS 0.5 $2,000.00 $1,000.00 <br />18 Tie-Out and Reestablish Survey Monument EA 3 $281.50 $844.50 <br /> SUBTOTAL $33,921.00 <br /> 5% Contingency $1,696.00 <br /> 5% Construction $1,696.00 <br /> TOTAL $37,313.00 <br />Residential Street Repair <br />Clinton Street Garden Grove side <br />NO. DESCRIPTION UNIT QUANTITY. UNIT PRICE COST <br />1 Unclassified Excavation Cy 75 $51.00 $3,825.00 <br />2 Cold Mill SF 12,883 $1.00 $12,883.00 <br />5 AC Pavement TN 120 $61.50 $7,380.00 <br />12 Adjust Manhole Frame and Cover to Grade EA 6 $518.50 $3,111.00 <br />17 Signing and Striping LS 0.5 $2,000.00 $1,000.00 <br />18 Tie-Out and Reestablish Survey Monument EA 2 $281.50 $563.00 <br /> SUBTOTAL $28,762,00 <br />, , <br /> 5°,b Contingency $1,438.00 <br /> 50"- Construction $1,438.00 <br /> TOTAL $31,638.00"` <br />Estimate GG