My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:36 AM
Creation date
4/29/2026 11:38:58 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
12
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITYOUTREACH <br /> Workshop Series#3—Preferred Alternative Features Feedback <br /> During Phase 3 of the outreach and engagement strategy, two in-person workshops were <br /> held in December 2025. Building on feedback from Workshop 2, the Design Options Poll, <br /> the project video, and additional stakeholder outreach, three refined corridor design <br /> concepts were developed and presented during Workshop 3. This indicates an iterative <br /> planning process that incorporates prior community input and stakeholder engagement to <br /> narrow options into more defined proposals for further consideration (Figure 19). <br /> Each design concept was printed on large poster boards, and corresponding aerial maps <br /> were available for each concept. Participants were invited to comment on specific design <br /> features, identify remaining concerns, and suggest final adjustments to ensure the selected <br /> alternative best reflected community needs and the Study's goals. <br /> 11 <br /> �J r <br /> P <br /> Figure 19: Workshop 3 participants discussed one of three design concept <br /> aerial maps at the community workshop event in December 2025. <br /> On Nov. 20, 2025, the outreach team visited 14 locations adjacent to and along the Study <br /> corridor to invite stakeholders to participate in the December Workshop 3 series. Study fact <br /> sheets, postcards, and posters in English, Spanish, and Vietnamese featuring information <br /> about the Study website and Workshop 3 were distributed at each location for display and <br /> sharing with visitors (Figure 20 and Figure 21). <br /> During these visits, outreach staff engaged directly with community members and increased <br /> awareness of opportunities to provide feedback and help inform the Study's design concept <br /> development. <br /> First Street Multimodal Boulevard Study—25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.