My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:36 AM
Creation date
4/29/2026 11:38:58 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
12
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITYOUTREACH <br /> TODAY!First Street Multi Modal Blvd Study Workshop;3 final design options D 0 L <br /> Dorian Romero<dorian@saascoalition.org> Q Dec 9,2025,11:22AM <br /> to Programs,Advisory <br /> Join HDR at this final community workshop to showcase the 3 final design options for First Street MultiModal Blvd Study.Come share your thoughts and vote <br /> for your preferred design option!Flyer attached <br /> "In this workshop,we will present the top three conceptual design alternatives for the three-mile corridor on First Street These alternatives are based on community input, <br /> field evaluation,and data analysis-City staff and project team members will be available to answer any questions or concerns. <br /> The same information will be provided on Tuesday and Thursday in an open-house format,with brief group presentations at 5 and 6 p.m.Feel free to join us when it is more <br /> convenient for you,either day between 4:30 and 6:30 p.m.,and feel free to bring a friend or neighborl Information will be available in English,Spanish,and Vietnamese_More details <br /> on the Flyer." <br /> � <br /> Dorian Romero,She/They <br /> Project Director,Santa Ana Active Streets <br /> 714-340-5186 <br /> LCI tl6944 <br /> )7a saasctwestreets <br /> Figure 30:A Santa Ana Active Streets newsletter was sent on Dec.9,2025,to promote Workshop 3. <br /> First Street Multimodal Boulevard Study—36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.