My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 12 - Select Locally Preferred Alternative for the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:36 AM
Creation date
4/29/2026 11:38:58 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
12
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITY OUTREACH <br /> The Q&A survey was open for 35 days and yielded 114 results. Several of the survey <br /> response results are shown below. <br /> • The primary responses for First Street challenges were "too much traffic or <br /> congestion" (81) and "feel unsafe to walk or ride a bike" (60). <br /> • Respondents overwhelmingly selected "driving" as their primary mode of <br /> transportation (81), with the next highest being "mix of different modes" (14), and <br /> only a few other modes, such as "bus" (5), "bike" (4), and "walk" (3). <br /> Design Options Poll and Video <br /> In late September, the team developed two videos outlining the eight design options <br /> presented at the second Community Workshop. They were posted on the Study website, <br /> along with a short poll asking viewers to select up to three preferred design options. <br /> One video featured a Spanish voiceover (Figure 35), and another featured an English <br /> voiceover with Vietnamese closed captions (Figure 36). The YouTube links were distributed <br /> to the CWG and at NA meetings to increase community participation. <br /> As of Jan. 31, 2026, the videos received the following engagement: <br /> • English with Vietnamese subtitles: 689 views and 13 likes. <br /> • Spanish: 186 views and 1 like. <br /> The poll was open from Sept. 30 through Oct. 31, 2025, and received the following <br /> engagement: <br /> • English: 195 responses <br /> • Spanish: 12 responses <br /> • Vietnamese: 0 responses <br /> Moving I p Moving <br /> Forward — 0 Forward <br /> 0 on First - 0 on First <br /> FIRST STREET MULTIMODAL _ — ! FIRST STREET MULTIMODAL <br /> BOULEVARD STUDYNNW BOULEVARD STUDY <br /> IY II. <br /> Opciones de Diseno del Bulevar Multimodal de First Street First Street Multimodal Boulevard Design Options <br /> city gr sama Ana Q A Shra Q cay o/sanla Ana 613 q 7 Share Q sa.e <br /> 1 Save ••• � <br /> 1 e6 News amonthsago 68g elews amonM ago <br /> aoudad de Same Ana esta estudiantlo coma mnverut laralle Fuse enveanstoly iuslittm un caretlor mis seguoy mWumotlal.limws 1.Gty of Santa Ana is-dying how to make Fvst Street hetwem&,slot sPd T,—asaler.morem 11—da1caridor Yh have li—w to <br /> scuchado las - de la comunidad Para ho de tliseiw la calla.Este Ndeo ex lira ratla do I le MirA n...nny lecmrk to come ur`nM1 8 tlesign optima Iw the mrm.This vitleo will explain each optan atd then ask you to mnk your TOP 3 at the <br /> ognioxs pr n,oc opctones para p opci Yuego P pollwae Fi St—sure, .. <br /> qua rakeque wsva lawnas en laencuesla aqd EMvesla ae First sue, ... <br /> Figure 35:Video in Spanish outlining the eight design Figure 36:Video in English with Vietnamese captions <br /> options presented at Workshop 2. outlining the design options presented at Workshop 2. <br /> First Street Multimodal Boulevard Study—40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.