My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> Santa Ana Blvd.Grade Separation <br /> Attachment E: Staging and Traffic Handling.................................................................... E <br /> AttachmentF: Shoofly .................................................................................................... F <br /> Attachment G: Right-of-Way Acquisition Map..................................................................G <br /> Attachment H: Existing & Proposed Utilities.................................................................... H <br /> AttachmentI: Cost Estimate............................................................................................I <br /> Attachment J: Preliminary Environmental Study (PES)....................................................J <br /> Attachment K: Categorical Exemption/Categorical Exclusion Determination Form.......... K <br /> Attachment L: Environmental Commitment Record .........................................................L <br /> Attachment M: Project Schedule......................................................................................M <br /> Attachment N: Geotechnical Technical Memorandum..................................................... N <br /> List of Tables <br /> Table 1 - Summary of Accident Data from the CPUC ..................................................... 5 <br /> Table 2 - Rail-Highway Grade Crossing Delay Analysis without Project.........................6 <br /> Table3 - Intersection LOS .............................................................................................. 7 <br /> Table4 - Cost Breakdown............................................................................................. 13 <br /> Table 5 - Environmental Concerns................................................................................ 16 <br /> Table 6 - Project Milestone Preliminary Dates ..............................................................23 <br /> PROJECT REPORT EQUIVALENT ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.