Laserfiche WebLink
EXHIBIT 2 <br /> Santa Ana Blvd. Grade Separation <br /> 12 ATTACHMENTS <br /> Attachment A — Highway-Rail Crossing Accident/Incident Reports <br /> Attachment B — Project Layout, Typical Section, and Profile <br /> Attachment C — Bridge General Plan <br /> Attachment D — Pedestrian Bridge Typical Section <br /> Attachment E — Staging and Traffic Handling <br /> Attachment F — Shoofly <br /> Attachment G — Right-of-Way Acquisition Map <br /> Attachment H — Existing & Proposed Utilities <br /> Attachment I — Cost Estimate <br /> Attachment J — Preliminary Environmental Study (PES) <br /> Attachment K — Categorical Exemption/Categorical Exclusion Determination Form <br /> Attachment L — Environmental Commitment Record <br /> Attachment M — Project Schedule <br /> Attachment N — Geotechnical Technical Memorandum <br /> PROJECT REPORT EQUIVALENT 25 <br />