Laserfiche WebLink
EXHIBIT 2 <br /> Appendixes <br /> Project Development Forms and Letters plus Policy and Procedures Documents <br /> Initial Site Assessment (ISA) Checklist <br /> (continued) <br /> CONTAMINATION: (spills, leaks,illegal dumping,etc.) <br /> Surface staining Typical pavement stains Oil sheen None observed <br /> Odors None observed Vegetation damage None observed <br /> Other None <br /> HAZARDOUS MATERIALS: (asbestos,lead,etc.) <br /> Buildings Potential Spray-on fireproofing n/a <br /> Pipe wrap n/a Friable tile n/a <br /> Acoustical plaster n/a Serpentine n/a <br /> Paint Potential Other <br /> 5. Additional record search, as necessary,of subsequent land uses that could have resulted in a hazardous <br /> waste site. Use the attached map to show the location of potential hazardous waste sites. <br /> 6. Other comments and/or observations: A review of the California Department of Toxic Substances' <br /> EnviroStor database revealed that the nearest site that utilizes hazardous waste and substances onsite is <br /> the Orange County Register(located at 625 N. Grand Avenue). This site is located approximately 800 <br /> feet south of the east end of the project site. <br /> ISA Determination <br /> Does the project have potential hazardous waste involvement? _Yes If there is known or potential <br /> hazardous waste involvement, is additional ISA work needed before task orders can be prepared for the <br /> Investigation? Yes If"YES," explain;then give an estimate of additional time required: <br /> An Initial Site Assessment will be prepared for the proposed project. It is anticipated to be completed in <br /> four months. <br /> A brief memo should be prepared to transmit the ISA conclusions to the Project Manager and Project <br /> Engineer. <br /> ISA Conducted by Brian Calvert Date June 16, 2011 <br /> DD-2 07/10/99 Project Development Procedures Manual <br />