My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> A Santa Ana Boulevar:, <br /> A COM Grade Separation Projecf: <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION................................................................................... 1 <br /> 1.1 Project Description...................................................................................1 <br /> 1.2 Study Area...............................................................................................4 <br /> 1.3 Study Periods...........................................................................................4 <br /> 2.0 ANALYSIS METHODOLOGY................................................................ 6 <br /> 2.1 Intersection Capacity Analysis..................................................................6 <br /> 2.2 Standard of Significance ..........................................................................7 <br /> 3.0 EXISTING CONDITIONS ...................................................................... 8 <br /> 3.1 Existing Roadway System........................................................................8 <br /> 3.2 Existing Traffic Volumes...........................................................................9 <br /> 3.3 Existing Intersection LOS.........................................................................9 <br /> 3.4 Existing Transit Facilities........................................................................11 <br /> 3.4.1 Existing Bus Stops ..................................................................12 <br /> 3.5 Existing Pedestrian Facilities..................................................................13 <br /> 3.6 Existing Bicycle Facilities .......................................................................13 <br /> 3.7 Existing Santa Ana Boulevard/OCTA Metrolink At-Grade Crossing........13 <br /> 3.7.1 Rail at-grade crossing impact criteria.......................................14 <br /> 4.0 OPENING YEAR (2016) CONDITIONS............................................... 16 <br /> 4.1 Opening Year (2016) Traffic Volumes....................................................16 <br /> 4.1.1 Background Growth.................................................................16 <br /> 4.1.2 Cumulative Projects ................................................................16 <br /> 4.2 Opening Year (2016) Intersection LOS ..................................................19 <br /> 5.0 FUTURE YEAR (2035) CONDITIONS................................................. 20 <br /> 5.1 Future Year (2035) Traffic Volumes .......................................................20 <br /> 5.2 Future Year (2035) Geometric Assumptions ..........................................21 <br /> 5.3 Future Year (2035) Intersection LOS......................................................23 <br /> 6.0 PROJECT TRAFFIC IMPACT ANALYSIS ........................................... 24 <br /> 6.1 Traffic Diversion Due to Termination of Logan Street North of Santa Ana <br /> Boulevard........................................................................................................24 <br /> 7.0 EXISTING PLUS PROJECT CONDITIONS ......................................... 25 <br /> 7.1 Existing Plus Project Levels of Service...................................................25 <br /> 8.0 OPENING YEAR PLUS PROJECT CONDITIONS................................ 27 <br /> 8.1 Opening Year Plus Project Levels of Service.........................................27 <br /> 9.0 FUTURE YEAR PLUS PROJECT CONDITIONS.................................. 30 <br /> 9.1 Future Year Plus Project Levels of Service ............................................30 <br /> 10.0 CONSTRUCTION ANALYSIS......................................................... 32 <br /> 10.1 Santa Ana Boulevard Capacity Analysis ................................................32 <br /> 10.2 Altnernative Route Capacity Analysis.....................................................33 <br /> 11.0 TRAIN CROSSING DELAY AND SAFETY ANALYSIS ................... 34 <br /> 11.1 Existing (2011) Rail-Highway traffic conditions.......................................35 <br /> 11.1.1 Rail-Highway Grade Crossing Delay .....................................35 <br /> Traffic/Circulation Study-Final May 18,2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.