My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> A Santa Ana Boulevar:, <br /> A COM Grade Separation Projecf: <br /> LIST OF FIGURES <br /> Figure1: Project Vicinity Map..........................................................................................2 <br /> Figure 2: Proposed Project Improvements ......................................................................3 <br /> Figure 3: Study Area Intersections and Existing Lane Configurations..............................5 <br /> Figure 4: Existing AM and PM Peak Hour Traffic Volumes............................................10 <br /> Figure 5: Opening Year(2016)AM and PM Peak Hour Traffic Volumes .......................18 <br /> Figure 6: Future Year(2035) AM and PM Peak Hour Traffic Volumes...........................22 <br /> Figure 7: Existing Plus Project AM and PM Peak Hour Traffic Volumes.......................26 <br /> Figure 8: Opening Year (2016) Plus Project AM and PM Peak Hour Traffic Volumes...28 <br /> Figure 9: Future Year (2035) Plus Project AM and PM Peak Hour Traffic Volumes......31 <br /> LIST OF TABLES <br /> Table 3-1 Levels of Service for Intersections..................................................................7 <br /> Table 4-1 Existing Intersection LOS...............................................................................9 <br /> Table 5-1 Cumulative Projects List and Descriptions....................................................17 <br /> Table 6-1 Opening Year (2016) Intersection LOS.........................................................19 <br /> Table 7-1 Future Year (2035) Intersection LOS............................................................23 <br /> Table 8-1 Existing plus Project Intersection LOS..........................................................25 <br /> Table 9-1 Opening Year plus Project Intersection LOS ................................................29 <br /> Table 10-1 Future Year plus Project Intersection LOS..................................................30 <br /> Table 11-1 Santa Ana Boulevard Roadway Segment Analysis.....................................33 <br /> Table 12-1 Alternative Route Roadway Segment Analysis...........................................34 <br /> Table 13-1 Existing Rail-Highway Grade Crossing Delay Analysis...............................35 <br /> Table 14-1 Existing Rail-Highway Grade Crossing Safety Analysis..............................35 <br /> Table 15-1 Opening Year(2016) Rail-Highway Grade Crossing Delay Analysis ..........36 <br /> Table 16-1 Opening Year(2016) Rail-Highway Grade Crossing Safety Analysis .........36 <br /> Table 17-1 Future Year(2035) Rail-Highway Grade Crossing Delay Analysis..............37 <br /> Table 18-1 Future Year(2035) Rail-Highway Grade Crossing Safety Analysis.............37 <br /> Table 19-1 CPUC Priority Index Number......................................................................38 <br /> Traffic/Circulation Study—Final May 18,2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.