Laserfiche WebLink
EXHIBIT 2 <br /> A=COM <br /> Table 5-1 Cumulative Projects List and Descriptions <br /> Res. Square <br /> Project Address Land Use Units Feet <br /> Alliance Church of Church Addition <br /> 1 Orange 2130 N Grand Ave. (Gym/classroom) 21,000 <br /> C&C Affordable <br /> 2 Housing Project 605 E Washington Ave. Residential apartments 36 <br /> 3 Catalina Retail Building 2102 N Tustin Ave. Commercial 5,580 <br /> Residential <br /> 4 City Venture 606-620 E Fifth St. Condo/Townhouse 8 <br /> Discovery Science <br /> 5 Center Ph. II 2032 N Main 275-seat IMAX theater <br /> Downtown Artist Lofts <br /> 6 III 201-291 N Sycamore St. Artist Live/Work Lofts 16 <br /> First and Cabrillo <br /> 7 Towers 1901 E First St. Residential Condo 374 <br /> 8 Francis Xavier 801 E Santa Ana Blvd. Apartments 12 <br /> Latino Health Access <br /> 9 Comm. Ctr. 602 E Fourth St. Public 3 074 <br /> 10 McDonalds 1100 S Grand Ave. Restaurant 3 838 <br /> 11 One Broadway Plaza 1109 N Broadway Residential Tower 518,000 <br /> Related Co.Apartments <br /> 12 Phase I 611 E Minter St. Residential apartments 74 <br /> Related Co.Apartments <br /> 13 Phase I 611 E Minter St. Commercial 1,500 <br /> Related Co.Apartments <br /> 14 Phase II 714 E Santa Ana Blvd. Residential apartments 13 <br /> Related Co.Apartments <br /> 15 Phase II 801 E Brown St. Residential apartments 12 <br /> Single Family <br /> 16 TAVA Homes 1584 E Santa Clara Ave. Residence 24 <br /> 17 1 Xerox Tower II 200 N Cabrillo Park Dr. Office 1 210,000 <br /> Source:City of Santa Ana Environmental Cumulative Project List(October 2011). <br /> Trips for these cumulative projects were forecast utilizing the Institute of Transportation <br /> Engineers (ITE) Trip Generation, 81h Edition and are documented in Appendix D. As <br /> shown in Appendix D, the 17 cumulative projects are anticipated to generate <br /> approximately 15,207 daily trips, with 1,465 trips occurring during the AM peak hour and <br /> 1,609 trips occurring during the PM peak hour. The trip distribution was based on other <br /> traffic study reports provided by the City of Santa Ana as well as likely routes to and from <br /> each of the planned projects. <br /> The resulting Opening Year (2016) background traffic volumes are shown in Figure 5. <br /> Traffic/Circulation Study—Final May 18,2012 <br />