My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Item 22 - Approve Adjustments & CIP Amendment, & Agreements with Mark Thomas, So Cal Regional Rail Authority (SCRRA), the U.S. Department of Transportation, & Caltrans for the Santa Ana Boulevard Grade Separation Project (No. 26-6718)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 1:39:30 PM
Creation date
4/30/2026 8:07:46 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
22
Date
5/5/2026
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> A=COM <br /> Table 5-1 Cumulative Projects List and Descriptions <br /> Res. Square <br /> Project Address Land Use Units Feet <br /> Alliance Church of Church Addition <br /> 1 Orange 2130 N Grand Ave. (Gym/classroom) 21,000 <br /> C&C Affordable <br /> 2 Housing Project 605 E Washington Ave. Residential apartments 36 <br /> 3 Catalina Retail Building 2102 N Tustin Ave. Commercial 5,580 <br /> Residential <br /> 4 City Venture 606-620 E Fifth St. Condo/Townhouse 8 <br /> Discovery Science <br /> 5 Center Ph. II 2032 N Main 275-seat IMAX theater <br /> Downtown Artist Lofts <br /> 6 III 201-291 N Sycamore St. Artist Live/Work Lofts 16 <br /> First and Cabrillo <br /> 7 Towers 1901 E First St. Residential Condo 374 <br /> 8 Francis Xavier 801 E Santa Ana Blvd. Apartments 12 <br /> Latino Health Access <br /> 9 Comm. Ctr. 602 E Fourth St. Public 3 074 <br /> 10 McDonalds 1100 S Grand Ave. Restaurant 3 838 <br /> 11 One Broadway Plaza 1109 N Broadway Residential Tower 518,000 <br /> Related Co.Apartments <br /> 12 Phase I 611 E Minter St. Residential apartments 74 <br /> Related Co.Apartments <br /> 13 Phase I 611 E Minter St. Commercial 1,500 <br /> Related Co.Apartments <br /> 14 Phase II 714 E Santa Ana Blvd. Residential apartments 13 <br /> Related Co.Apartments <br /> 15 Phase II 801 E Brown St. Residential apartments 12 <br /> Single Family <br /> 16 TAVA Homes 1584 E Santa Clara Ave. Residence 24 <br /> 17 1 Xerox Tower II 200 N Cabrillo Park Dr. Office 1 210,000 <br /> Source:City of Santa Ana Environmental Cumulative Project List(October 2011). <br /> Trips for these cumulative projects were forecast utilizing the Institute of Transportation <br /> Engineers (ITE) Trip Generation, 81h Edition and are documented in Appendix D. As <br /> shown in Appendix D, the 17 cumulative projects are anticipated to generate <br /> approximately 15,207 daily trips, with 1,465 trips occurring during the AM peak hour and <br /> 1,609 trips occurring during the PM peak hour. The trip distribution was based on other <br /> traffic study reports provided by the City of Santa Ana as well as likely routes to and from <br /> each of the planned projects. <br /> The resulting Opening Year (2016) background traffic volumes are shown in Figure 5. <br /> Traffic/Circulation Study—Final May 18,2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.