Laserfiche WebLink
EXHIBIT 2 <br /> STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor <br /> PUBLIC UTILITIES COMMISSION <br /> 515 L Street,Suite 1119 pf <br /> Sacramento,CA 95814 <br /> 6Ywt <br /> July 20, 2009 File Number: G.09-07-003 <br /> Orange Subdivision— Santa Ana Blvd <br /> City of Santa Ana, County of Orange <br /> Ron Mathieu <br /> Manager, Rail Corridor C&E <br /> SCRRAJMetrolink <br /> 700 South Flower Street, 26`h Floor <br /> Los Angeles, CA 90017-4101 <br /> Re: General Order 88-B Request for Authority to alter and modify the At-Grade <br /> Crossing of Southern California Regional Rail Authority / Metrolink Orange <br /> Subdivision tracks and iantta Ana Blvd in the City of Santa Ana, County of Orange <br /> Dear Mr. Mathieu: <br /> This refers to your letter, dated May 28, 2009 (received June 9, 2009) requesting authorization, <br /> pursuant to California Public Utilities Commission (CPUC) General Order (GO) 88-B, to alter the <br /> existing at-grade crossing of Southern California Regional Rail Authority / Metrolink <br /> (SCRRA/Metrolink) Orange Subdivision tracks and Santa Ana Blvd (CPUC Crossing Number <br /> 101 OR-17 5.10 and DOT Number 026702V) in the City of Santa Ana(City), County of Orange. <br /> Santa Ana Blvd is an East-West roadway located south of 17th Street, Santa Ana Blvd intersects the <br /> SCRRA/Metrolink tracks west of Grand Avenue. There are two mainline tracks through this <br /> crossing. The Santa Ana Metrolink Station is adjacent to this crossing. The proposed alterations to <br /> the Santa Ana Blvd crossing, as indicated in the request letter and/or shown on the plans shall. <br /> consist of: <br /> • Installation of pedestrian treatments, including automatic pedestrian gates and emergency exit <br /> swing gates, detectable warning strips, handrails and fencing on all sidewalk approaches; <br /> Upgrade southwest quadrant CPUC Standard 9 to CPUC Standard 9-A; <br /> • Installation of concrete walkway to the Metrolink station in the southeast quadrant; <br /> • Installation of queue-cutter traffic signal for westbound traffic; <br /> • Installation of 4-in travel lane and edge lines over tracks and through the crossing; <br />