My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I First Street Multimodal Corridor <br /> Technical Memorandum <br /> introduction of newer large-scale commercial and mixed-use developments is expected to <br /> create clearer, more defined boundaries in Santa Ana. The Pedestrian and Bicycle Analysis <br /> Technical Memorandum (attached separately) provide a more detailed assessment of the <br /> findings presented in this section. <br /> VNest Bristol Hub: Bristol StrePtto Win R., <br /> • Neighborhoods: Flower Park, Downtown, Pico-Lowell, Heninger Park <br /> • Character: Heavily commercial with shopping centers, civic uses, and surface <br /> parking <br /> Downtown Historic Center: Main Street to Grand Avenue <br /> • Neighborhoods: Downtown, French Park, Lacy, Logan, Pacific Park <br /> • Character: Historic downtown, civic buildings, smaller retail, denser housing, <br /> transitions into mixed residential eastward. <br /> East City Gateway: Grand Avenue to Tustin Avenue <br /> • Neighborhoods: Saddleback View, Zoo District, Lyon Street. <br /> • Character: Motels, Santa Ana Zoo, mix of offices, high-density residential, freeway <br /> edge conditions. <br /> This section summarizes existing pedestrian and bicycle conditions along First Street and its <br /> intersection crossings.The analysis uses a customized ranking system based on the <br /> Pedestrian Environmental Quality Index (PEQI), typical First/Last Mile evaluation criteria, <br /> and Level of Traffic Stress (LTS),with adjustments tailored to the study area. This approach <br /> emphasizes the pedestrian experience and provides a more qualitative measure of <br /> walkability and bikeability. <br /> Walkability Bicycle Conditions <br /> • Land Use & Neighborhood • Facility Quality <br /> Character • Intersection Safety <br /> • Streetscape Design (roadway, • Bicycle Network Connectivity <br /> traffic speeds,sidewalk, • Level of Traffic Stress (LTS) <br /> landscape, & lighting*) <br /> • Pedestrian Access <br /> • Connectivity & Safety <br /> • Intersection Safety <br /> Lighting is notevaluated but should be studied <br /> further in coordination with the City's Lighting <br /> Masterplan <br /> City Council 12 — 13 5/5/20 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.