My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I First Street Multimodal Corridor <br /> FN Technical Memorandum <br /> Community Engagement <br /> Community engagement is a key component of identifying barriers to mobility along First <br /> Street. Beginning in June 2025 and wrapping up in December 2025, the outreach strategy <br /> reached over 900 participants, summarized in Figure 15. <br /> In order to achieve balanced input throughout this process,a multi-tiered outreach strategy <br /> was conducted, which included: <br /> • Broad community outreach <br /> through workshops, pop up <br /> events and targeted small <br /> Meetings <br /> group meetings. <br /> r1t.keholder <br /> • Stakeholder engagement with <br /> both city and government <br /> officials as well as active <br /> organizations in the 900+ <br /> community '" <br /> Digital Flyers Community <br /> • Community working group Members <br /> meetings with community- <br /> Engaged <br /> based organizations who <br /> assisted with driving <br /> participation at the community <br /> events and bringing <br /> awareness to the project. OY <br /> • Presentations to <br /> Neighborhood Associations Figure 15: Multi-tiered Outreach Strategy <br /> along the corridor. <br /> Information at key points in the project was disseminated through workshops and then <br /> shared with the community through on-line surveys, pop up events, videos, and <br /> presentations at stakeholder, community working group and neighborhood association <br /> meetings. The timeline for sharing information about the project is summarized in Figure 16. <br /> In this section, the results of Workshop 1 are summarized. Input from the community from <br /> Workshop 2 and Workshop 3 are summarized in the Options and Concepts sections of this <br /> technical memorandum as the results align with preference surveys and input collected <br /> related during those phases of the project. <br /> City Council 12 — 35 5/5/2 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.