My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITY OUTREACH SUMMAR <br /> Background <br /> First Street is currently a six-lane street with a raised median between intersections and left-turn <br /> pockets at intersections. It serves OCTA's OC Bus Route 64, one of the highest-ridership routes <br /> in Orange County, with nearly 50 stops in Santa Ana alone. <br /> In 2022, the City of Santa Ana identified First Street as a corridor for multimodal improvements <br /> and updated the Mobility Element of the City's General Plan, which proposed downgrading First <br /> Street's classification from a Major Arterial (six lanes) to a Primary Arterial (four lanes). In 2024, <br /> the City's Vision Zero Plan identified it as one of the top five corridors requiring safety <br /> enhancements, particularly for vulnerable road users, including pedestrians and bicyclists. <br /> The Study explored the breadth of potential roadway configurations for purposes of identifying <br /> viable options to transform and improve the corridor into a truly multimodal corridor for all modes <br /> of travel, regardless of age or ability. The Study also evaluated concepts that enhanced access <br /> to businesses, residential neighborhoods, educational facilities, and other key destinations <br /> (Figure 3). <br /> vo <br /> fA` <br /> Figure 3: Image of Flower Street signal from the Study walk audit on July 16,2025. <br /> City Council -T 5 5/5/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.