My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITY OUTREACH SUMMARY <br /> The Q&A survey was open for 35 days and yielded 114 results. Several of the survey <br /> response results are shown below. <br /> • The primary responses for First Street challenges were "too much traffic or <br /> congestion" (81) and "feel unsafe to walk or ride a bike" (60). <br /> • Respondents overwhelmingly selected "driving" as their primary mode of <br /> transportation (81), with the next highest being "mix of different modes" (14), and <br /> only a few other modes, such as "bus" (5), "bike" (4), and "walk" (3). <br /> Design Options Poll and Video <br /> In late September, the team developed two videos outlining the eight design options <br /> presented at the second Community Workshop. They were posted on the Study website, <br /> along with a short poll asking viewers to select up to three preferred design options. <br /> One video featured a Spanish voiceover (Figure 35), and another featured an English <br /> voiceover with Vietnamese closed captions (Figure 36). The YouTube links were distributed <br /> to the CWG and at NA meetings to increase community participation. <br /> As of Jan. 31, 2026, the videos received the following engagement: <br /> • English with Vietnamese subtitles: 689 views and 13 likes. <br /> • Spanish: 186 views and 1 like. <br /> The poll was open from Sept. 30 through Oct. 31, 2025, and received the following <br /> engagement: <br /> • English: 195 responses <br /> • Spanish: 12 responses <br /> • Vietnamese: 0 responses <br /> !z d <br /> Moving g, p Moving y <br /> Forward -_ q 0 Forward - <br /> 0 on First = - 0 on First <br /> R!. FIRST STREET MUI.TIMODAL It — ".�'t FIRST STREET MULTIMODAL <br /> BOULEVARD STUDY �p I BOULEVARD STUDY _ <br /> I � l <br /> a <br /> Opcienes de Diseno del Bulevar Multimadal de First Street First Street Multimodal Boulevard Design Options <br /> ciny etnse nra ana ® odor sanea Me � Ly is e,� �j snare p sa.e <br /> ... <br /> 1g6 vlewa a maW-:v vgo 680 A—4—ft agq <br /> Le oudadrp 5erna Maesle eswd'andocomo mnvenrle cell F' e9risiol Tust'ak en un wnedor mes He. <br /> Iunvdel_ ih¢CtY of Santa Maas study agl aw tomehe Frsl SrY¢et b¢iwesn Brsid IMT stin asat¢r mor¢malfmodl A¢r Webar.¢In ¢d to <br /> y segumymu cammunny leedh}ta mmeWwnhedes qn oprionsfw the stnxr Tfi 'd ill explan earls opimend th sk you so rankye Tav set the <br /> acughrdq{as¢pnlmnes dele cgmnnimd pars prgpgnar ocm op-es detllWopara la rane_esre weeq exprra�a We"wegolepealra Don hare:car strepr same_moa <br /> qua alifquaws[res favwilaaenlasncues[a agsf::Egqu—d Fl-Svae... <br /> Figure 35:Video in Spanish outlining the eight design Figure 36:Video in English with Vietnamese captions <br /> options presented at Workshop 2. outlining the design options presented at Workshop 2. <br /> City Council — 5/5/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.