My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2026-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/05/2026 Regular, HA
>
Agenda Packet_2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 9:47:48 AM
Creation date
4/30/2026 2:01:27 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> 'M <br /> BERNARRS <br /> 11. Work related to permanent tie-ins to the Federal or State buildings (mechanical, structural, or other utility <br /> connections) is not included unless explicitly requested and authorized. <br /> 12. Utility capacity upgrades or off-site utility infrastructure improvements beyond disconnection <br /> and termination are excluded. <br /> 13. Permitting and associated fees for traffic control plans, street closures, or public right-of-way <br /> improvements are excluded, except as needed for haul routes or demolition access. <br /> 14. Fabrication or procurement of permanent fixtures (e.g., lighting poles, signage, railings) is not included; <br /> design intent documents only are provided. <br /> 15. Any services required by agencies not listed in the scope coordination (such as FEMA, SHPO, or EPA) are <br /> excluded unless later requested and approved. <br /> 16. Full construction-phase services (such as construction administration, inspections, and contractor <br /> coordination during demolition) are not included in the preconstruction phase. <br /> 17. Design or coordination for future tenant improvements or programming within adjacent buildings is <br /> excluded. <br /> 18. Traffic control plans and encroachment permit required drawings and fees are not included. <br /> 19. Any additional services and associated reports for hazardous material sampling and Geotechnical exploration services <br /> already completed in Bernards COR No. 1 scope. <br /> 20. Design of temporary stairs. <br /> 21. Additional round/s of bidding and GMP preparation. (only one round of bidding and GMP is included). <br /> 22. Changes proposed after approval of previous direction and/or completion of design documents. <br /> 23. Design services for Landscaping, Low Voltage,Access Control,Security, Fire Protection and Fire Alarm. <br /> City Council 21 — 14 5/5/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.