Laserfiche WebLink
see last page for 15-30 ADDENDUM NO.01 <br /> CITY OF SANTA ANA Project 23-6998 <br /> Project 14-6947 <br /> PROPOSAL Project 26-6716 <br /> PROJECT NO. 23-6998, ATPL 5063(179)—RAITT ST PROTECTED AND BUFFERED BIKE LANE <br /> PROJECT NO. 19-6947—RAITT ST REHABILITATION FROM MCFADDEN AVE TO 1 ST ST <br /> PROJECT NO. 26-6716—RAITT ST REHABILITATION FROM CIVIC CENTER DR TO <br /> WASHINGTON AVE <br /> 31 Furnish and Install New Manhole ATP 5 35 EA $ $ <br /> Frame and Cover and Adjust to SBI 30 1600.00 <br /> Finish Grade <br /> 32 Adjust OCSD Manhole Frame and ATP 1 16 EA $ $ <br /> Cover to Finish Grade SBI 15 1600.00 <br /> 33 Abandon Existing Gate Valve. ATP 0 1 LS $ $ <br /> Remove Valve Box Frame and <br /> Cover. Cut Off Riser 18" Below SBI 1 600.00 <br /> Grade. Backfill with Sand, <br /> Compact,and Repave <br /> 34 Adjust Sewer Cleanout Frame and ATP 0 1 3 EA $1200.00 $ <br /> Cover to Finish Grade SBI 3 <br /> 35 Furnish and Install New#6 Pullbox ATP 8 10 EA $ $ <br /> f SBI 2 21600.0 <br /> 36 Adjust Survey Monument to Finish ATP 7I 5 EA $ $ <br /> Grade SBI 77 <br /> 600.00 <br /> 37 Furnish and Install Traffic Loop ATP 8 33 EA $ $ <br /> Type F SBI 25 715.00 <br /> 38 Furnish and Install Traffic Loop ATP 16 71 EA $ $ <br /> Type E sat 77 715.00 <br /> 39 Furnish and Install Traffic Loop ATP 2 6 EA $ $ <br /> Type Q SBI 4 <br /> 715.00 <br /> 40 Concrete Neighborhood Monument ATP 0 1 LS $ $ <br /> (Including(2)Solar Light Fixtures SBI I <br /> and(1)Remoted Solar Panel) 65000.0 <br /> 41 Landscaping and Irrigation ATP 0.09 l LS $ $ <br /> Ss I 0.91 69000.00 <br /> 42 Install Street Light Pole— ATP 0 1 EA $ $ <br /> Foundations,Pole Luminaries SBI 1 11000.00 <br /> 43 Stormwater Pollution Prevention ATP 0.38 1 LS $ $ <br /> Plan(SWPPP)Preparation(Risk SBI 0.62 <br /> Level 2)and Implementation 50000.00 <br /> 44 14' x 8'Contech Filterra or ATP 0.38 1 LS $ $ <br /> Approved Equal SBI 0.62 138000.0 <br /> 45 6"PVC Pipe,Appurtenances,and ATP 38 100 LF $ $ <br /> Bedding per C.S.A. Std. 1150 SBI 62 300.00 <br /> P-3 of P-22 <br />