Laserfiche WebLink
2025 URBAN WATER MANAGEMENT PLAN <br /> MAY 2026/FINAL DRAFT/CAROLLO <br /> Table 8.1 Cross-Reference for Standard vs Supplier Shortage Levels <br /> SupplierSubmittal Table 8-1: Cross-reference for Standard vs .. <br /> Water Code Section 1, <br /> 0Check the box if the Supplier •. • six levels of • .•- <br /> Proceed to the next table. MA <br /> Standard Shortage Percent Shortage Suppliers Shortage Percent Shortage <br /> Levels Range Levels Range <br /> 1 Up to 10% <br /> 2 Up to 20% <br /> 3 Up to 30% <br /> 4 Up to 40% <br /> 5 Up to 50% <br /> 6 >50% <br /> NOTES: <br /> Table 8.2 Supply Augmentation and Other Actions <br /> SupplySubmittal Table 8-2 Retail: <br /> Water Code Section1. <br /> YesIs the Supplier • . - . this table using the standard • <br /> Supply Augmentation Methods and How much is this going to reduce <br /> Other Actions by Water Supplier the short-fie ap? <br /> • .•- .• Additional Explanation or <br /> Shortage Drop down list .. , Reference <br /> Level These are the only categories that ,_ _ _ . , (OPTIONAL) <br /> will be accepted by the WUEdata <br /> online submittal tool (AF) <br /> Add additional rows as needed <br /> 1 through 6 Other Purchases Percentage 0-100% Additional imported water <br /> purchases through MET <br /> Additional groundwater <br /> 1 through 6 Other Purchases Percentage 0-100% pumping through Orange <br /> County Groundwater Basin <br /> DWR NOTES: Units of measure(AF,CCF,MG)must remain consistent throughout the UWMP as reported in Submittal <br /> Table 2-3. <br /> NOTES:Additional Imported Water Purchases to meet the supply gap may have financial ramifications per the MET's Water <br /> Supply Allocation Plan.Additional Groundwater Pumping in the Orange County Groundwater Basin is subject to OCWD's <br /> policies and may be subject to financial ramifications. <br /> AF-acre-feet;CCF-centum cubic feet; MG-million gallons <br /> CITY OF SANTA ANA 8-4 <br />