My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/19/2026 Regular, Special HA
>
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 11:52:37 AM
Creation date
5/13/2026 11:50:25 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
21
Date
5/19/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 WATER SHORTAGE CONTINGENCY PLAN <br /> MAY 2026/FINAL DRAFT/CAROLLO <br /> Contents <br /> SECTION 1 INTRODUCTION AND WSCP OVERVIEW 1 <br /> 1.1 Water Shortage Contingency Plan Requirements and Organization 1 <br /> 1.2 Integration with Other Planning Efforts 2 <br /> SECTION 2 BACKGROUND INFORMATION 3 <br /> 2.1 City Service Area 4 <br /> 2.2 Relationship to Wholesalers 5 <br /> 2.3 Relationship with Wholesaler Water Shortage Planning 7 <br /> 2.3.1 MET Water Surplus and Drought Management Plan 7 <br /> 2.3.2 MET Water Supply Allocation Plan 8 <br /> SECTION 3 WATER SHORTAGE CONTINGENCY PREPAREDNESS AND <br /> RESPONSE PLANNING 10 <br /> 3.1 Water Supply Reliability Analysis 10 <br /> 3.2 Annual Water Supply and Demand Assessment Procedures 10 <br /> 3.2.1 Decision-Making Process 11 <br /> 3.2.2 Data and Methodologies 12 <br /> 3.3 Six Standard Water Shortage Levels 16 <br /> 3.4 Shortage Response Actions 17 <br /> 3.4.1 Supply Augmentation 17 <br /> 3.4.2 Demand Reduction 17 <br /> 3.4.3 Operational Changes 17 <br /> 3.4.4 Additional Mandatory Restrictions 17 <br /> 3.4.5 Emergency Response Plan (Hazard Mitigation Plan) 18 <br /> 3.4.6 Seismic Risk Assessment and Mitigation Plan 19 <br /> 3.4.7 Shortage Response Action Effectiveness 20 <br /> 3.5 Communication Protocols 20 <br /> 3.6 Compliance and Enforcement 20 <br /> 3.7 Legal Authorities 20 <br /> 3.8 Financial Consequences of WSCP 21 <br /> 3.9 Monitoring and Reporting 22 <br /> 3.10 WSCP Refinement Procedures 22 <br /> 3.11 Special Water Feature Distinction 23 <br /> 3.12 Plan Adoption, Submittal, and Availability 23 <br /> SECTION 4 REFERENCES 24 <br /> CITY OF SANTA ANA <br /> pw://Carollo/CA/MWDOC/204447-000000/03 Reports and Studies102 Deliverables/Grp3_Santa Ana UWMP/SantaAna_2025 WSCP.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.