My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/19/2026 Regular, Special HA
>
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 11:52:37 AM
Creation date
5/13/2026 11:50:25 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
21
Date
5/19/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
202S WATER SHORTAGE CONTINGENCY PLAN <br /> MAY 2026/FINAL DRAFT/CAROLLO <br /> However, if revisions to the WSCP are warranted before the UWMP is updated, the WSCP will be updated <br /> outside of the UWMP update cycle. In the course of preparing the AWSDA each year, City staff will <br /> routinely consider the functionality of the overall WSCP and will prepare recommendations for the <br /> Director of Public Works if changes are found to be needed. <br /> 3.11 Special Water Feature Distinction <br /> Per Water Code Section 10632 (b), the City has defined water features that are artificially supplied with <br /> water, including ponds, lakes,waterfalls, and fountains, separately from swimming pools and spas, as <br /> defined in subdivision (a) of Section 115921 of the Health and Safety Code, in the City's Municipal Code <br /> Chapter 39 Article VI (Appendix B). <br /> 3.12 Plan Adoption, Submittal, and Availability <br /> Per Water Code Section 10632 (a)(c), the City provided notice of the availability of the Public Review Draft <br /> 2025 UWMP and 2025 WSCP and notice of the public hearing to consider adoption of the WSCP. The <br /> Public Review drafts of the 2025 UWMP and the 2025 WSCP were posted prominently on the City's <br /> website 14 days in advance of the public hearing on May 19, 2026. Copies of the Draft WSCP were also <br /> made available for public inspection at the City Clerk's and Utilities Department offices and public hearing <br /> notifications were published in local newspapers.A copy of the published Notice of Public Hearing is <br /> included in Appendix D. <br /> City held the public hearing for the Draft 2025 UWMP and Draft WSCP on May 19, 2026 at the City <br /> Council meeting.The City Council reviewed and approved the 2025 UWMP and the WSCP at its <br /> May 19, 2026 meeting after the public hearing. See Appendix E for the resolution approving the WSCP. <br /> By July 1, 2026,the City's adopted 2025 UWMP and WSCP was filed with DWR, California State Library, <br /> and the County of Orange. The City will make the WSCP available for public review on its website no later <br /> than 30 days after filing with DWR. <br /> Based on DWR's review of the WSCP, the City will make any amendments to its adopted WSCP, as <br /> required and directed by DWR. <br /> If the City revises its WSCP after the UWMP is approved by DWR, then an electronic copy of the revised <br /> WSCP will be submitted to DWR within 30 days of its adoption. <br /> CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.