My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
05/19/2026 Regular, Special HA
>
Item 21 - Public Hearing - Resolutions Approving the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 11:52:37 AM
Creation date
5/13/2026 11:50:25 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
21
Date
5/19/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 URBAN WATER MANAGEMENT PLAN <br /> MAY 2026/FINAL DRAFT/CAROLLO <br /> 3.5.2 Projected Land Uses 3-8 <br /> CHAPTER 4 WATER USE CHARACTERIZATION <br /> 4.1 Water Use in the Last Five Years 4-4 <br /> 4.1.1 Direct Municipal and Industrial Use 4-5 <br /> 4.2 Projected Water Use 4-6 <br /> 4.2.1 Water Use Projections for 2026-2030 4-6 <br /> 4.2.2 Water Use Projections for 2030-2050 4-6 <br /> 4.3 Water Demand Projection Methodology 4-9 <br /> 4.3.1 Econometric Approach, Data Acquisition, and Model Development 4-9 <br /> 4.3.2 Forecasted Demands 4-12 <br /> 4.4 Water Loss 4-13 <br /> CHAPTER 5 CONSERVATION TARGET COMPLIANCE <br /> 5.1 Reporting Requirements 5-1 <br /> CHAPTER 6 WATER SUPPLY CHARACTERIZATION <br /> 6.1 Water Supply Overview 6-1 <br /> 6.2 Imported Water 6-5 <br /> 6.2.1 Metropolitan Water District of Southern California 6-5 <br /> 6.2.2 Colorado River Aqueduct 6-8 <br /> 6.2.3 State Water Project 6-11 <br /> 6.2.4 Storage, Transfers, and Conveyance Programs 6-14 <br /> 6.2.5 Potential Future Water Projects 6-16 <br /> 6.2.6 Supply Reliability within MET 6-17 <br /> 6.3 Local Groundwater 6-22 <br /> 6.3.1 Orange County Groundwater Basin 6-22 <br /> 6.3.2 Planned Future Groundwater Sources 6-29 <br /> 6.4 Surface Water 6-30 <br /> 6.4.1 Existing Surface Water Sources 6-30 <br /> 6.4.2 Planned Future Surface Water Sources 6-30 <br /> 6.5 Stormwater 6-30 <br /> 6.5.1 Existing Stormwater Sources 6-30 <br /> 6.5.2 Planned Future Stormwater Sources 6-30 <br /> 6.6 Wastewater and Recycled Water 6-31 <br /> 6.6.1 Agency Coordination 6-31 <br /> 6.6.2 Wastewater 6-33 <br /> 6.6.3 Current Recycled Water Uses 6-33 <br /> 6.6.4 Projected Recycled Water Uses 6-34 <br /> 6.6.5 Potential Recycled Water Uses 6-35 <br /> 6.6.6 Optimization Plan 6-35 <br /> CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.