Laserfiche WebLink
EXHIBIT B <br /> Appendix <br /> ATTACHMENT 4 <br /> CONTRACT COMPARISON FORM <br /> RFP NO. 26-018 <br /> SPILL RESPONSE, HAZARDOUS WASTE DISPOSAL, AND STORM <br /> DRAIN FACILITY MAINTENANCE SERVICES <br /> Proposers shall complete this form and include it as part of the fee proposal. This form will be used <br /> for fee comparison purposes and cost proposal scoring. <br /> LABOR RATES OF CONTRACTOR PERSONNEL&EQUIPMENT RATES: <br /> Hourly Rates <br /> Classification Straight Time Over-Time Premium Time <br /> Project Manager $151.00 $196.00 $254.00 <br /> Supervisor $144.00 $190.00 $236.00 <br /> Lead Technician $121.00 $192.00 $250.00 <br /> Equipment Operator $137.00 $208.00 $266.00 <br /> Technician $121.00 $192.00 $250.00 <br /> Stake Bed Truck w/Liftgate $60.00 $60.00 $60.00 <br /> Vactor/letter Combo Truck $221.00 $253.00 $261.00 <br /> Catch Basin Cleaning Truck or Trailer <br /> w/Vacuum and Pressure Washer $125.00 $158.00 $165.00 *** <br /> All personnel shall have a minimum of 40 hours HAZ-WOPER training as specified by 29 CFR <br /> 1910-120. <br /> NOTES: <br /> Rates above should include prevailing wage. If'truck rate includes operator,please note that. <br /> Straight Time:Monday through Friday,from 7:00 am to 4:00 pm. <br /> Overtime:Monday through Friday, before 7:00 am and after 4:00 pm, and all day <br /> Saturday. <br /> Premium Time: Sundays, City Holidays, and after 12 hours of work. <br /> = All pricing will remain fixed for the first year of the contract, and rates for subsequent <br /> contract years will increase per the Consumer Price Index for the previous 12-month <br /> period up to a 2.5% maximum annually (Ref. Q&A 1.5). Equipment rates include fuel. <br /> ** = Vactor/Jetter Combo Truck operated by "Equipment Operator" (separate charge) <br /> *** = Catch Basin Cleaning Truck operated by "Lead Technician" (separate charge) <br /> City of Santa Ana RFP 26-018 Page A4-1 <br />